My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-263 <br />4.11.4.8 Route Segment 3a <br />Route Segment 3a is a very short route segment (only 0.1 mile long) that would connect to the existing <br />Vantage Substation. The area surrounding the Vantage Substation and near Wanapum Dam has been <br />extensively investigated by archaeologists and there are over 150 previously recorded cultural resources <br />within one mile of Route Segment 3a. <br />Physical Impacts <br />Short-term and long-term ground disturbance along this route segment would total 1.2 acres. All of the <br />land within 75 feet of the centerline of Route Segment 3a has been surveyed for cultural resources. Two <br />archaeological resources and one architectural resource, the Vantage Substation, have been previously <br />recorded. The substation has been determined eligible to the National Register, but the tie-in of a new <br />transmission line would not have an impact on this existing facility. Of the two archaeological sites, both <br />prehistoric lithic scatters, one has been determined not eligible to the National Register and one is <br />unevaluated. <br />Therefore, physical impacts of Route Segment 3a would potentially be high only at the unevaluated <br />archaeological site. The remainder of the route segment would have low physical impacts. <br />Visual Impacts <br />All of the land within 250 feet of the centerline of Route Segment 3a has been surveyed for cultural <br />resources. In addition to the two archaeological resources mentioned above, the Vantage Substation, the <br />Midway to Vantage No. 1 Transmission Line, and the Vantage to Columbia No. 1 Transmission Line <br />have been recorded as cultural resources in this area. All three of these architectural resources have been <br />determined eligible to the National Register by the Washington DAHP, but none of them would be <br />visually impacted by the presence of this new transmission line route segment. The one unevaluated <br />archaeological site in the vicinity does not have characteristics that would make it sensitive to changes in <br />visual setting. <br />Therefore, visual impacts of Route Segment 3a on cultural resources would be low. <br />Native American Concerns <br />The YNCRP has not identified any resources of special concern along Route Segment 3a (Lally and <br />Camuso 2011). Impacts are expected to be low. <br />4.11.4.9 Route Segment 3b <br />Route Segment 3b is 21.7 miles long and for most of its distance runs along the abandoned railroad ROW <br />corridor next to or near (west of) the Columbia River. Much of the land within one mile and west of the <br />route segment centerline is on JBLM YTC. The proportion of land surveyed for cultural resources is <br />higher than most other segments, but it is still relatively small. Even without intensive surveys, there have <br />been hundreds of cultural resources identified over the years within one mile of this route segment <br />centerline, especially near the river. These include lithic scatters, village sites, burials, rock shelters, rock <br />features of various sizes and shapes, petroglyphs and pictographs as well as many historic sites. Far fewer <br />cultural resources have been recorded in the higher, more rugged terrain on JBLM YTC within one mile <br />of the route segment centerline, with more than half being lithic scatters. <br />Physical Impacts <br />Short-term and long-term ground disturbance along this route segment would total 107.9 acres. In all, <br />12 percent of the land within 75 feet of the centerline of Route Segment 3b has been surveyed by <br />archaeologists and cultural resources have also been recorded in locations not subject to intensive survey. <br />There are 44 known archaeological resources within 75 feet of the route segment centerline. These <br />include a prehistoric archaeological district; prehistoric lithic scatters, cairns and rock features,
The URL can be used to link to this page
Your browser does not support the video tag.