My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-241 <br />ACTION ALTERNATIVES <br />IMPACT ON EMPLOYMENT AND INCOME <br />IMPACT ON POPULATION IMPACT ON HOUSING IMPACT ON GOVERNMENT REVENUE1 <br />NNR Alternative - MR Subroute <br />NNR-1, NNR-2, <br />NNR-3, MR-1, <br />NNR-5, NNR-6, <br />NNR-7, NNR-8 <br />47.8 miles <br />Temporary (one year) <br />increase to Study <br />Region employment of <br />66 jobs or 0.01 <br />percent of Study <br />Region total <br />employment and $4.5 <br />million in personal <br />income. <br />Impacts approximately <br />equal to NNR <br />Alternative. <br />Slightly greater impacts on <br />crowding and prices in hotels <br />and RV parks than NNR <br />Alternative with no MR <br />Subroute, but minimal. <br />-County Property <br />Tax: $190,228 <br />-State Property Tax: <br />$46,490 <br />-BLM ROW Rent: <br />$7,806 <br />1Reliable estimates of the total costs of ROW payments for Action Alternatives that would use JBLM YTC land cannot be made at this time <br />because actual field appraisals by the USACE for JBLM YTC crossings needs to be performed for all Action Alternatives. <br />*Agency Preferred Alternative <br />4.9.7 Mitigation Measures <br />Impacts on socioeconomic resources are assessed as generally negligible. Impacts that may occur are <br />mostly characterized as positive (increased demand for local goods and services, employment and <br />income). Some potential for excess demand for transient housing (RV spaces and hotel rooms) could <br />occur to the Action Alternatives in the peak summer/fall months, but such impacts would be temporary <br />and ameliorated by market mechanisms if providers raise prices in response to increased demand. Since <br />no appreciable socioeconomic impacts would occur, mitigation measures would not be needed. <br />4.9.8 Property Values <br />4.9.8.1 General Property Effects and Compensation <br />Construction of the proposed Project would require new ROWs that would involve a combination of <br />ROW grants and easements between the Proponent and federal, state, and local governments; other <br />companies (e.g., utilities); and private landowners. ROWs for transmission facilities on private lands <br />would be obtained in fee simple or perpetual easement by Pacific Power. <br />The effect that a transmission line easement may have on property is an issue that would be negotiated <br />between the land owner and the Proponent during the easement acquisition process. The easement <br />acquisition process is designed to provide fair compensation to the landowner for the right to use the <br />property for transmission line construction and operations. Pacific Power would establish land valuation <br />for affected lands based on county assessor valuation, market research, parcel appraisal, and zonal <br />appraisal information. <br />The required transmission line easements may encumber the affected ROW area with land use limitations. <br />Each easement would specify the extent of any encumbrances. Typical transmission line easement <br />conditions include the right to clear the ROW and keep clear of trees, structures, including structure- <br />supported crops, brush, vegetation and other potential fire and electrical hazards. Some non-structure <br />supported agricultural crops may be allowed on some easement properties, depending on height. <br />The impact of introducing a new ROW for transmission structures and lines can vary depending on the <br />placement on the ROW in relation to the property’s size, shape, and the location of existing <br />improvements. A transmission line may affect the utility of a portion of property if the line effectively <br />severs an area from the remaining property. The introduction of a new transmission line can also have <br />impacts on farms by reducing the acreage available for cultivation and in some cases disrupting existing <br />harvest patterns with new transmission line structures affecting the farmer’s ability to maneuver
The URL can be used to link to this page
Your browser does not support the video tag.