My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-221 <br />4.8.6 Mitigation Measures <br />The following mitigation measures have been identified to reduce, avoid, minimize, or rectify adverse <br />impacts to visual resources. These mitigation measures would be implemented where warranted, are <br />anticipated to be effective, and are summarized in Table 4.8-9 below. <br />Table 4.8-9 Vantage-Pomona Heights Transmission Project Mitigation Measures <br />MITIGATION MEASURE DESCRIPTION <br />VR – 1: Avoid Interference with Prominent Views <br />(Micro-siting) <br />To minimize visual impacts to sensitive views and within standard <br />engineering practices and to the extent feasible, the final locations of <br />transmission line structures would be adjusted to avoid locations that <br />place the structures in the middle of the line of sight toward important <br />views from residences, roads, trails, and other key observation areas. <br />VR – 2: Maximize Span Length at Linear Feature <br />Crossings <br />At highways, trails, canyons, or other sensitive feature crossings, <br />structures shall be placed at the maximum feasible distance from the <br />crossing within standard structure design and in conformance with <br />engineering and Pacific Power requirements to reduce visual impacts <br />and potential impacts on recreation values and functions and to <br />increase safety at these locations. <br />VIS – 3: Span Matching of Existing Structures <br />To the extent practicable and within the limits of standard structure <br />design, Pacific Power shall match existing structure spacing, spans <br />and heights as closely as possible to reduce visual complexity as <br />seen from high concern viewpoints. <br />VIS – 4: Avoid Skylining of Structures <br />To the extent practical, Pacific Power shall design and locate <br />transmission structures so that they do not break the skyline or are <br />directly on the skyline when viewed from sensitive viewpoints. <br />4.8.7 Residual Impacts <br />To minimize potential impacts to visual resources, selective mitigation measures described in Table 4.8-9 <br />above would be implemented. Residual impacts for all of the route segments are presented in <br />Table 4.8-10. <br />To minimize the effects of potential view obstruction, mitigation measure VR-1: Avoid Interference with <br />Prominent Views (Micro-siting) would be implemented in specific locations as necessary. Mitigation <br />measure VR-1 would be effective at reducing impacts by siting structures in areas that are not within the <br />line of sight to landscape focal points from specific locations as identified in consultation with the <br />landowner and would reduce impacts from high to moderate or from moderate to low. This mitigation <br />measure would be implemented in the following locations: <br />• Route Segment 1a/NNR-1: MP 0.8-2.3 <br />• Route Segment 1c: MP 10.2-10.7 <br />• Route Segment 3b: MP 19.1-19.3 (Interim VRM Class III mitigation) <br />• Route Segment 1a/NNR1: MP 0.8-2.4 <br />To minimize the effects of structure dominance as seen from sensitive viewpoints, mitigation measure <br />VR-2: Maximize Span Length at Linear Feature Crossings would be implemented in specific locations as <br />necessary. Mitigation measure VR-2 would be effective at reducing impacts by placing the structures at <br />the maximum feasible distance from the viewpoint to reduce their dominance in the landscape, and would <br />reduce impacts from high to moderate or from moderate to low. This mitigation measure would be <br />implemented in the following locations:
The URL can be used to link to this page
Your browser does not support the video tag.