My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-218 <br />Scenic Quality Impacts and Development Character <br />Scenic quality impacts would be moderate to high due to the level of Project contrast. In lower scenic <br />quality areas, moderate impacts would occur due to the level of change in the undeveloped landscape. <br />Low impacts are expected where the route segment would require minimal new road construction in <br />gently sloping areas dominated by annual or perennial grassland. <br />WSDOT conducted a visual quality evaluation of the I-82 Crossing #3 based on the FHWA’s Visual <br />Impact Assessment for Highways methodology. Existing visual quality was rated as 4.83 (high) at the <br />highway crossing. With the implementation of the route segment at this location, the visual quality of the <br />highway in the area of the highway would drop to 4.25 (moderately high). There would be some <br />degradation of visual quality in the area of the transmission structures, but visual impacts would not reach <br />a substantial level (WSDOT 2014). <br />Sensitive Viewer Impacts <br />Residences, I-82 travelers and Manastash Ridge Viewpoints would be impacted by the route segment. <br />I-82 travelers would have very brief and limited views of the route segment as it crosses the highway near <br />the Manastash Ridge westbound viewpoint due to the elevated position of the crossing and the <br />topographic screening where the highway cuts through steep terrain at the crossing. However, more <br />extended duration views would occur to the west of the highway where the route segment would parallel <br />it to the south. Due to the distance from the highway, a minimum of approximately 0.5 mile, the Project <br />contrasts would not be dominant in the viewshed. Therefore, impacts on I-82 travelers would be <br />moderate. <br />At the closest Manastash Ridge Viewpoint on westbound I-82, Route Segment MR-1 would be within the <br />immediate foreground of viewers. The primary orientation of views from the rest area is toward the <br />Kittitas Valley to the north. The route segment would cross the highway at the entrance to the rest area, <br />away from the primary viewing orientation, with several structures being visible from the Manastash <br />Ridge Viewpoint. The route segment would be screened by topography after it turns to the south and <br />parallels the JBLM YTC boundary adjacent to Badger Pocket. The implementation of mitigation measure <br />VR-2 would reduce the impacts of the route segment in this location. <br />From the I-82 eastbound viewpoint, Route Segment MR-1 would be seen from a superior position and at <br />a greater distance. More of the route segment would be seen as it follows the JBLM YTC boundary at <br />Badger Pocket and strong or moderate contrasts would be seen in the middleground or background. As <br />with the westbound viewpoint, viewing orientation is not in the direction of the route segment and <br />impacts would be moderate to low. <br />From the Badger Pocket residential and agricultural area, the route segment would be skylined and <br />viewed against Manastash Ridge in an area that is undeveloped on JBLM. Strong or moderate-strong <br />contrasts would be seen in the immediate foreground or foreground, respectively, from these high <br />sensitivity areas causing high impacts along most of this portion of the route segment. <br />The Umtanum Ridge Water Gap NNL (access road on the east side of SR-821) is located in the <br />background within the Project area, and views are typically screened by topography. Therefore, there <br />would be low or no impacts on the NNL. <br />Agency Management Compliance <br />This route segment crosses land managed by JBLM YTC, who has no policies related to the management <br />of visual resources. <br />
The URL can be used to link to this page
Your browser does not support the video tag.