My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-215 <br />Scenic Quality Impacts and Development Character <br />Overhead Design Option <br />Scenic quality in the area of Route Segment NNR-6o is influenced by the presence of the existing <br />Pomona-Wanapum 230 kV transmission line. Because Project contrasts are typically weak to moderate- <br />weak, scenic quality impacts would be moderate to low. <br />Underground Design Option <br />As with the Overhead Design Option, scenic quality in the area of Route Segment NNR-6u is influenced <br />by the presence of the existing Pomona-Wanapum 230 kV transmission line. However, because of the <br />presence of the overhead to underground transition stations and potentially large areas of cut and fill, low <br />to moderate scenic quality impacts would result from the route segment. <br />Sensitive Viewer Impacts <br />Overhead Design Option <br />Sensitive viewers, residences and John Wayne Pioneer Trail users, would typically see Project contrasts <br />in the seldom seen or background distance zone. On the west end of the route segment, the route segment <br />would be seen in the middleground by residences and on the east end in the middleground by John Wayne <br />Pioneer Trail users. Therefore, route segment impacts on sensitive viewers would be low. <br />Underground Design Option <br />As with the Overhead Design Option, sensitive viewers would typically see Project contrasts in the <br />seldom seen or background distance zone. Because the landscape contrasts would be greater for the <br />Underground Design Option (Route Segment NNR-6u) in steep terrain on the west end of the route <br />segment and ROW cut areas would be seen axially from residences, slightly higher impacts would result <br />as compared to the Overhead Design Option. High impacts on John Wayne Pioneer Trail users in the area <br />of the overhead to underground transition station would occur. <br />Agency Management Compliance <br />Overhead Design Option <br />Route Segment NNR-6o crosses land managed by JBLM YTC, who has no policies related to the <br />management of visual resources. <br />Underground Design Option <br />Route Segment NNR-6u crosses land managed by JBLM YTC, who has no policies related to the <br />management of visual resources. <br />4.8.5.16 Route Segment NNR-7 <br />Visual Contrasts <br />The western portion of Route Segment NNR-7 parallels the existing Pomona-Wanapum 230 kV; the <br />eastern portion parallels the existing Pomona-Wanapum 230 kV, Wanapum-Wind Ridge 230 kV, <br />Vantage-Schultz No.1 500 kV, and Schultz-Wautoma No.1 500 kV transmission lines. As a result, <br />structure contrast for Route Segment NNR-7 would be weak. Similar terrain and vegetation are crossed, <br />as well, resulting in typically weak landscape contrasts; some moderate landscape contrast would occur in <br />steeper areas dominated by Group 3 vegetation. Overall, Project contrasts would be weak along the entire <br />route segment.
The URL can be used to link to this page
Your browser does not support the video tag.