Laserfiche WebLink
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-190 <br />exist. A total of eight combinations of ROW corridor and structure configurations are possible, including <br />consideration of transition stations for the Underground Design Option. These combinations would result <br />in varying degrees of structure contrast (no existing transmission, distribution underbuild, Project <br />parallels 230 kilovolt (kV) and 115 kV corridor, Project parallels lattice 500 kV corridor, and Project <br />parallels two 230 kV and two 500 kV corridors). For the structure contrast model, only H-frame or single <br />pole structures were assumed along the route segments. Figure 4.8-1 shows the visual characteristics of <br />the structures. Table 4-8.3 - Structure Contrast Matrix shows the various combinations, landscape <br />viewing context, and resulting structure contrast. <br />As the final step in contrast analysis, the overall Project contrast was determined based on the <br />combination of landscape and structure contrast along the route segment centerlines (see Table 4.8-4). <br />Strong structure contrasts but weak landscape contrasts would typically produce strong-moderate Project <br />contrasts. For example, in situations where no new roads are being built and minimal ground cover <br />vegetation is removed (weak landscape contrast), the introduction of a new 90-foot H-frame structure <br />where none currently exists (strong structure contrast) would create strong overall visual contrasts <br />because the transmission line structures are the primary Project elements that affect viewers or <br />landscapes. <br />Table 4.8-4 Project Contrast Matrix <br />LANDSCAPE <br />CONTRAST <br />STRUCTURE CONTRAST <br />Strong Strong-Moderate Moderate Moderate-Weak Weak None <br />Strong S S S/M M M M/W <br />Moderate S S/M M M M/W W <br />Weak S/M M M M/W W W <br />N/A, None M M M/W W W N <br />Key: S=Strong; S/M=Strong/Moderate; M=Moderate; M/W= Moderate/Weak; W=Weak, N=None. <br />4.8.2.2 Impact Types <br />Direct and indirect visual resource impacts are difficult to distinguish because the effects occur at the <br />same time and place but simultaneously occur at a further removed distance (e.g., impacts as a result of <br />views from sensitive recreation area and scenic quality impacts on vegetation and landform). Impacts may <br />be considered short-term and long-term. <br />The development of the proposed Project has the potential to result in three basic types of impacts to <br />visual resources. Construction impacts would be considered temporary that result from the presence of <br />construction vehicles and equipment that cause ground disturbance, equipment structure contrasts, and air <br />emissions. Operations and maintenance impacts may be short-term or long-term. Maintenance activities <br />would also be considered short-term or periodic if they are also related to the presence of construction <br />vehicles and equipment and associated ground and air disturbances. Operation impacts would be <br />primarily associated with the long-term use and presence of the proposed Project (transmission lines, <br />underground-overhead transition stations, cleared duct bank and access road corridor, structures, <br />substations, overhead transmission line access roads) in the landscape. Visual contrast (see Section 4.8.2.1 <br />above), including the effects of light and glare, would be produced during construction, operations, and <br />maintenance of the proposed Project. <br />The general types of impacts caused by the construction, operations, and maintenance of the proposed <br />Project include: <br />