Laserfiche WebLink
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-181 <br />On the east side of the Columbia River, existing roads would require minimal improvements. The route <br />segment would cross SR-243, requiring consultation and coordination with WSDOT. A Utility Permit <br />would be required from WSDOT. The transmission structures would not be placed within either the <br />highway ROW corridor or WSDOT’s Control Zone. Authorization to span the Columbia River for Route <br />Segment NNR-8 would be required from USACE through the Section 10 Rivers and Harbors Act <br />permitting process. In addition, DNR’s aquatic use authorization for the crossing of state-owned aquatic <br />land would be required. Resulting impacts on the transportation network in this area would be low. <br />Flashing lights or spherical balls on the conductors may be required for the portion of the route segment <br />crossing the Columbia River. Pacific Power would consult with the FAA regarding the installation of <br />lights or any other visual warning devices required for aviation safety. Resulting impacts would be low. <br />Route Segment NNR-8 would require the construction of approximately 0.9 mile of new access road and <br />0.2 mile of improved access road for a total of approximately 1.1 miles of new road. <br />4.7.4.18 Route Segment MR-1 <br />Access to route segment MR-1 would be from minor two-track roads crossing rangeland on private and <br />DNR state trust land west of I-82 and from Silk Road, Boland Road, Vanderbilt Road, and two-track <br />roads within the JBLM YTC (Figure 4.7-4). This route segment does not generally follow existing roads <br />for a substantial portion of the route segment and new road construction would be necessary (Access <br />Levels 4 through 7). Route Segment MR-1 would require the construction of approximately 2.0 miles of <br />spur road and 16.7 miles of new access road for a total of approximately 18.7 miles of new road. <br />This route segment would cross I-82 at MP 5.1-5.2. This crossing would involve the placement of a <br />structure on private land on the west side of I-82 directly south of the WSDOT’s westbound Manastash <br />Ridge Viewpoint. The other structure would be placed on the eastern side of the interstate on the JBLM <br />YTC. The crossing length would be approximately 1,270 feet. Conductor to ground clearance of this <br />interstate crossing would be a minimum of 34 feet according to WSDOT. No structures would be placed <br />within the interstate ROW corridor. Temporary road closure of I-82 during conductor stringing activities <br />would occur to maintain safety. A Utility Permit would be required from WSDOT. Impacts on I-82 traffic <br />are discussed in Section 4.7.3 (Impacts Common to All Alternatives) and would be low. <br />Table 4.7-2 New Road Construction Summary by Route Summary <br />ROUTE SEGMENT MILES OF NEW SPUR ROAD MILES OF NEW ACCESS ROAD TOTAL MILES OF NEW ROAD <br />1a/NNR-1 <br />2.4 miles 0.95 0.00 0.95 <br />1b <br />12.5 miles 4.52 1.32 5.84 <br />1c <br />12.9 miles 3.88 4.43 8.31 <br />2a <br />1.0 mile 0.2 0.64 0.84 <br />2b <br />16.4 miles 1.88 15.23 17.11 <br />2c <br />18.1 miles 5.04 6.23 11.27 <br />2d <br />7.0 miles 1.48 4.67 6.15 <br />3a <br />0.1 mile 0.08 0 0.08 <br />3b <br />21.7 miles 8.52 0 8.52 <br />3c <br />25.4 miles 8.64 3.28 11.92