My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-174 <br />4.7.4.11 Route Segment NNR-2 <br />Route Segment NNR-2 would be located within the JBLM YTC and accessed from Sage Trail Road, <br />Firing Center Road, Evergreen State Road, East Pomona Road, and the JBLM YTC perimeter fire break <br />road. Some new road construction would be required where the route segment diverges from the <br />perimeter of the JBLM YTC. Firing Center Road is the main road servicing JBLM YTC from Yakima <br />and Selah and delays during construction would be longer as compared to other similar roads because of <br />restricted access to the area of the route segment. A section of Pacific Power distribution line located <br />along the south side of Firing Center Road would require reconstruction for this route segment. This <br />added construction requirement would increase the overall total construction time as compared to H- <br />frame construction on undeveloped land, but the increase in construction time would not be substantial. <br />Alternatively, construction access could occur from East Pomona Road and Evergreen State Road which <br />would reduce impacts on the JBLM YTC main gate traffic. Lane closures on the JBLM YTC would likely <br />occur for short periods of time. Road closures along a portion of this route segment may also be <br />necessary, but alternative traffic routes are typically available within the JBLM YTC cantonment area of <br />the route segment. The route segment would cross Firing Center Road at Mile Post (MP) 3.6-3.7, <br />Evergreen State Road at MP 3.9-4.0, and E. Pomona Road within JBLM YTC at MP 4.6-4.7. RDFs, such <br />as the development of a Traffic Management Plan, would be implemented to reduce impacts on traffic <br />within JBLM YTC and on county and private roads. Damage to roads will be repaired as directed by the <br />private road owners, Yakima County, and JBLM YTC based on ownership and jurisdiction. <br />Access Levels for Route Segment NNR-2 are assumed as Level 2 for the entire route segment. This route <br />segment would require the construction of approximately 2.0 miles of spur roads. Low impacts are <br />expected as a result of the construction of Route Segment NNR-2. <br />4.7.4.12 Route Segment NNR-3 <br />This route segment would be accessed from JBLM YTC, private land located off of Deweese Lane, Selah <br />Creek Drive, BLM roads servicing the Selah Butte area, Burbank Creek Road (private), and an unnamed <br />private road north of Baldy Butte. Much of the route segment would use the existing access roads where <br />the route segment parallels Pacific Power’s existing Pomona-Wanapum 230 kV transmission line (Figure <br />4.7-2). <br />Route Segment NNR-3 would also cross I-82 at transmission line MP 0.0-0.1 just south of the Selah <br />Creek Rest Area. The Selah Creek Rest Area is located at highway MP 24.5, approximately. The crossing <br />would involve the placement of one transmission structure on the eastern side of the interstate within the <br />JBLM YTC boundary. The other transmission structure on the western side of the interstate would be <br />placed on private property near a WSDOT pond and southwest of the Selah Cliffs Rest Area. No <br />structures would be placed within the interstate ROW corridor or the rest area. Access on either side of <br />the interstate would occur from JBLM YTC on the southeast or from the private parcel on the northwest. <br />The approximate length of this crossing would be about 740 feet and would utilize H-frame structures. <br />Conductor to ground clearance for this crossing would be a minimum of 34 feet. Impacts on I-82 traffic <br />are discussed in Section 4.7.3. A permanent access break would be required for this crossing. The rest <br />area would not be used for staging of equipment or other Project-related purposes. All staging would be <br />outside the WSDOT ROW corridor at this location. Other impacts on I-82 traffic are discussed in Section <br />4.7.3 (Impacts Common to All Alternatives) and would be low. Temporary road closure of I-82 during <br />conductor stringing activities would occur to maintain safety. <br />Transportation impacts created as a result of this route segment may include short-term access delays to <br />agricultural areas around Deweese Lane from construction traffic in the area of the route segment line on <br />private land west of the Selah Cliffs I-82 Rest Area. Delays in traffic could occur that would affect access <br />to the residential area located along Selah Cliffs Drive, to the Selah Butte Watchable Wildflower Area, <br />and along Burbank Creek Road. This route segment would cross Burbank Creek Road at MP 4.9-5.0.
The URL can be used to link to this page
Your browser does not support the video tag.