My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-142 <br />I-82 (the route segment crosses under I-82). Refer to Section 4-7 for impacts and necessary WSDOT <br />approvals to cross I-82. <br />This route segment also crosses land classified as Farmland of Statewide Importance (0.2 mile) and Prime <br />Farmland (0.9 mile) causing 1.1 miles of long-term disturbance. However, this is non-agricultural land, so <br />impacts would be moderate. <br />The Project would be in compliance with the Final Cultural and Natural Resources Management Plan for <br />the JBLM YTC. <br />Livestock grazing impacts would be low and areas disturbed by construction would be minimal. <br />Following construction the underground ROW corridor would be kept clear of any structures and the only <br />compatible use would consist of grazing activities. The cleared ROW corridor is to ensure that the <br />underground duct bank and splice vaults are accessible for maintenance and transmission cable repairs for <br />the life of the proposed Project. The route segment is located entirely in Kittitas County. Private land is <br />crossed between MP 0.0-1.2. The Project would be in compliance with the Kittitas County <br />Comprehensive Plan (2014). In Kittitas County, a Conditional Use Permit would be necessary. <br />This route segment would also cross private lands targeted for acquisition or conservation easement as <br />part of the Integrated Plan. These potential acquisition/conservation easement lands are located between <br />MP 0.0-1.2. Overall, moderate impacts would occur for 4.5 miles and low impacts would occur for 0 <br />miles of this route segment. A total of 8.7 acres of short-term impacts and 6.3 acres of long-term impacts <br />on acquisition/conservation easement lands would occur. <br />4.4.4.14 Route Segment NNR-5 <br />Route Segment NNR-5 would cross approximately 1.8 miles of the JBLM YTC resulting in long-term <br />impacts. This route segment would be located within Training Area 16 and Training Area 1. Training <br />Area 16 is crossed between MP 0.0 and 1.4 and Training Area 1 is crossed between MP 1.4 and 1.8. <br />Military operations in this area would be minimally affected because the route segment would be on the <br />perimeter of training activity areas and new transmission line structures would be located adjacent to an <br />existing fire break road. Impacts would be moderate because the area available for training activities <br />would be reduced; although, activities could continue to occur. <br />This route segment also crosses land classified as Farmland of Statewide Importance (0.6 mile) and Prime <br />Farmland (0.1 mile) causing 0.7 mile of long-term disturbance. However, this is non-agricultural land, so <br />impacts would be moderate. <br />The route segment would be in compliance with the Final Cultural and Natural Resources Management <br />Plan for the JBLM YTC. <br />Overall, moderate impacts would occur for 1.8 miles of this route segment. <br />4.4.4.15 Route Segment NNR-6o/6u <br />Overhead Design Option <br />Route Segment NNR-6o would cross approximately 6.4 miles of the JBLM YTC resulting in long-term <br />impacts. Training Area 1 would be crossed between MP 0.0-2.2. Training Area 3 would also be crossed <br />between MP 2.2-6.4. Military operations in this area would be minimally affected because the route <br />segment would be on the perimeter of training activity areas. Impacts would be moderate because the area <br />available for training activities would be reduced, although activities could continue to occur.
The URL can be used to link to this page
Your browser does not support the video tag.