Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> <br /> PAGE 4-123 <br />Alternative - Underground Design Option would result in slightly fewer transmission line structures than <br />the Agency Preferred Alternative, the number of structures greater than 0.25 mile from an existing line <br />would be the same and the acres of direct habitat disturbance would be slightly higher. Thus, the NNR <br />Alternative - Underground Design Option did not have different overall impact levels for Sage-Grouse <br />than the Agency Preferred Alternative.