My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> <br /> PAGE 4-89 <br />are expected to be low for the 0.3 miles of the route segment within winter range, with no identifiable <br />impacts to elk outside of the winter range. <br />All habitat disturbance associated with Route Segment 2a is within the Regularly Occupied Habitat MU <br />for Sage-Grouse. Construction activities would disturb less than one percent of Regularly Occupied <br />Habitat (Table 4.3-7). All 6.0 acres of anticipated ground disturbance would occur in marginal Sage- <br />Grouse habitat (Table 4.3-8). RDFs are anticipated to be effective at reducing impacts to Sage-Grouse <br />habitat (refer to Sections 4.3.3.1 and 4.3.3.2). The scale of disturbance and degradation to Sage-Grouse <br />habitat is anticipated to be low for the entire 1.0-mile long route segment. <br />Construction of Route Segment 2a would require approximately 7 structures, all of which would be <br />located greater than 0.25 mile from an existing transmission line (Table 4.3-5). One hundred percent of <br />the Route Segment 2a ROW is within the estimated core Sage-Grouse population range (Figure 3.3-4). <br />One active lek (Lek #4) occurs within four miles of Route Segment 2a (Table 3.3-7). Lek #4 is located <br />approximately 3.9 miles east of Route Segment 2a; it is described in more detail for Route Segment 2b to <br />which it is more closely located. Approximately 0.6 miles of Route Segment 2a are within four miles of <br />an active or inactive lek. Potential impacts to lekking Sage-Grouse would be minimized by the <br />implementation of RDFs (refer to Sections 4.3.3.1 and 4.3.3.2). Lek impact levels are anticipated to be <br />low for 0.4 mile and moderate for 0.6 mile. <br />4.3.4.5 Route Segment 2b <br />Approximately 76.1 acres of long-term and 19.3 acres of short-term disturbance would occur through the <br />construction of Route Segment 2b. Most of the permanently disturbed area would be sagebrush/perennial <br />grassland (65.8 acres), with the remaining. 10.3 acres split among annual grassland, noxious weeds, <br />agriculture, disturbed ground, perennial grassland, and intermittent stream/dry gully (Table 4.3-4). Short- <br />term disturbance is prominently annual grassland (11.7 acres), along with agriculture/disturbed land (4 <br />acres), perennial grassland (2.5 acres), and intermittent stream/dry gully (1.1 acres). RDFs would be <br />implemented to minimize habitat loss and degradation, as described in Section 4.3.3.1. Impact levels to <br />habitat are expected to be low for five miles and moderate for 11.4 miles (sagebrush/perennial grassland <br />for 11.1 miles and intermittent stream/dry gully for 0.3 miles). <br />The presence of new transmission line structures, which could provide additional perch and/or nesting <br />sites for avian predators, could negatively impact nearby prey species such as small mammals and avian <br />species, particularly when the new structures are built in an area where perching opportunities currently <br />do not exist (i.e., greater than 0.25 mile from existing structures or trees). Construction of Route Segment <br />2b would require an estimated 116 structures in a landscape dominated by low growing grasses and <br />shrubs. All new structures would be located greater than 0.25 mile from an existing transmission line or <br />trees (Table 4.3-5). <br />Within one mile of Route Segment 2b, potentially suitable habitat is present for 38 special status wildlife <br />species that are possible, likely, or known to occur (Tables 3.3-2, 3.3-3, and 3.3-7). Potential impacts and <br />RDFs to address them are discussed in Sections 4.3.3.1 and 4.3.3.2. Species or wildlife resources that <br />have been documented at specific locations within one mile of Route Segment 2b include elk winter range <br />and a black-tailed jackrabbit occurrence. <br />All 16.3 miles of Route Segment 2b are within the Rattlesnake Elk Winter Range Regular Concentration <br />area. RDFs to minimize impacts to elk will include a seasonal restriction on construction. Specifically, <br />construction would be avoided during the wintering season, typically December 1 through March 1, or as <br />defined by WDFW for each big game population in question (Section 2.3). The avoidance RDF is <br />anticipated to be effective at minimizing impacts to elk; therefore, impacts are expected to be low for the <br />entire 16.3-mile long route segment.
The URL can be used to link to this page
Your browser does not support the video tag.