My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> <br /> PAGE 4-44 ROUTE SEGMENT HABITAT SUITABILITY1 SPECIAL STATUS PLANTS AND COMMUNITIES <br />SUITABLE MARGINAL UNSUITABLE <br />WNHP <br />SPECIAL STATUS PLANT POLYGONS CROSSED <br />SPECIAL <br />STATUS PLANTS FOUND DURING SURVEY <br />WNHP PRIORITY ECOSYSTEM CROSSED <br />mi ac % mi ac % mi ac % mi mi mi <br />1c <br />12.9 miles 3.2 6.0 26.1 8.6 16.2 70.2 1.2 0.8 3.6 0.5 0 0 <br />2a <br />1.0 mile 0.0 0.0 0.0 1 2.1 100.0 0.0 0.0 0.0 0 0 0 <br />2b <br />16.3 miles 11.4 26.2 73.3 3.9 7.3 20.4 1.1 2.3 6.3 0.6 0.5 0 <br />2c <br />18.1 miles 4.6 8.0 35.4 6 9.5 41.8 7.6 5.2 22.8 0 0 0 <br />2d <br />7.0 miles 5.7 12.8 83.3 1.4 2.6 16.7 0.0 0.0 0.0 2.1 0.6 0 <br />3a <br />0.1 mile 0.2 0.1 100.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 <br />3b <br />21.7 miles 5.6 6.5 20.9 1.8 1.5 4.9 14.3 22.7 73.5 9.5 1.2 0 <br />3c <br />25.2 miles 10.1 12.2 46.2 5.7 6.8 26.0 9.2 6.7 25.5 6.4 0 2.9 <br />NNR-2 <br />5.1 miles 0.9 0.7 18.5 2.4 1.8 45.7 1.9 1.4 35.8 0 0 0 <br />NNR-3 <br />9.3 miles 7.0 13.6 77.3 1.9 3.6 20.2 0.1 0.0 0.0 4.1 2.6 0 <br />NNR-4o <br />4.5 miles 2.5 2.3 43.4 2.1 3.0 56.6 0.0 0.0 0.0 0 0 0 <br />NNR-4u <br />4.5 miles 2.5 6.3 47.4 2.1 7.0 52.6 0.0 0.0 0.0 0 0 0 <br />NNR-5 <br />1.8 miles 1.8 1.5 100.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 <br />NNR-6o <br />6.4 miles 6.3 6.4 97.4 0.2 0.2 2.6 0.0 0.0 0.0 0.3 0 0 <br />NNR-6u <br />6.4 miles 6.3 10.0 98.4 0.2 0.2 1.6 0.0 0.0 0.0 0.3 0 0 <br />NNR-7 <br />8.2 miles 8.3 7.2 100.0 0.0 0.0 0.0 0.0 0.0 0.0 3.4 0 0 <br />NNR-8 <br />2.7 miles 1.5 1.6 68.9 0.9 0.7 31.1 0.4 0.0 0.0 0.6 0 0 <br />MR-1 <br />11.9 miles 4.4 12.5 36.9 4.9 12.8 37.7 2.6 8.6 25.3 0 0 0.4 <br />1 Linear miles crossed (mi) = inventory measurement; Acres (ac) = amount of long-term disturbance; % = percent of vegetation type disturbed <br />(acres) compared to the total amount of disturbance (acres) for the Route Segment. <br />2 Total long-term disturbance to vegetation does not include disturbance to agriculture, disturbed or developed and water. Acres of short-term <br />disturbance are presented in the discussion section for each route segment.
The URL can be used to link to this page
Your browser does not support the video tag.