My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> <br /> PAGE 4-19 <br />Impacts for Route Segment 1c are anticipated to be: 1.2 miles of no identifiable, 8.7 miles of low, and 3.1 <br />miles of moderate. <br />Special Status Species and Priority Habitats <br />No federally listed plants are known to occur along Route Segment 1c (Table 4.2-5). WNHP data indicate <br />that snowball cactus is known to occur along Route Segment 1c and Nuttall’s sandwort and Hoover’s <br />tauschia occur within one mile of Route Segment 1c. No WNHP priority ecosystems are known to occur <br />along Route Segment 1c. One hundred percent (1.7 acres) of federal lands within this route segment were <br />surveyed for special status plants; however, the majority of Route Segment 1c is comprised of non-federal <br />land (249.6 acres) and was not surveyed (Table 3.2-3). As not all land within the route segment was <br />surveyed, impacts could occur to special status plant species. Long-term disturbance would occur to <br />potential habitat for special status plants, including 6.0 acres of suitable, 16.2 acres of marginal, and 0.8 <br />acre unsuitable habitat. RDFs described above for Route Segment 1a/NNR-1 would also be implemented <br />during construction and maintenance of Route Segment 1c to minimize impacts to special status plants. <br />With the implementation of RDFs, impacts to special status plant species and potential suitable habitat are <br />anticipated to include 1.2 miles of no identifiable, 8.6 miles of low impacts, and 3.2 miles of moderate <br />impacts. <br />Snowball Cactus <br />WNHP data indicate that snowball cactus intersects Route Segment 1c for 0.5 mile. These locations <br />include large buffers, so it is difficult to accurately determine whether these occurrences truly intersect the <br />ROW corridor. All potential habitat on federal and state lands was surveyed; therefore, it is unlikely <br />snowball cactus occurs in Route Segment 1c. With the implementation of RDFs described above and the <br />assumption that occurrences would be spanned and avoided, Project construction, operation, and <br />maintenance activities could impact individuals or habitat (moderate impact), but would not contribute a <br />trend toward federal listing. Refer to Route Segment 1b for more information on snowball cactus. <br />4.2.4.4 Route Segment 2a <br />General Vegetation <br />Long-term disturbance to approximately 2.1 acres of land would occur with the construction of Route <br />Segment 2a (Table 4.2-4). Construction would result in the long-term disturbance of 1.9 acres of annual <br />grasslands and 0.2 acre of perennial grasslands. Short-term disturbance would occur to approximately 3.9 <br />acres of vegetation. General vegetation impacts are similar to those described above for Route Segment <br />1a/NNR-1. Disturbance would be minimized by RDFs described above that are designed to reduce <br />impacts to vegetation resources. RDFs include using existing public roads to access structure sites, <br />minimizing blading and disturbance to plant communities, revegetating following construction, and <br />implementing a Noxious Weed and Invasive Plant Management Plan. Refer to Section 2.3 - Required <br />Design Features Common to Action Alternatives for a complete list and description of RDFs. <br />Impacts for Route Segment 2a are anticipated to be: 1.0 mile of low. <br />Special Status Species and Priority Habitats <br />No special status plant species or priority ecosystems are known to occur along Route Segment 2a (Table <br />4.2-5). No WNHP priority ecosystems are known to occur along Route Segment 2a. The entirety of Route <br />Segment 2a is comprised of non-federal land (19.3 acres) and was not surveyed (Table 3.2-3). As land <br />within the route segment corridor was not surveyed, impacts could occur to special status plant species. <br />Long-term disturbance would occur to 2.1 acres of marginal habitat for special status plants. RDFs <br />described above for Route Segment 1a/NNR-1 would also be implemented during construction and <br />maintenance of Route Segment 2a to minimize impacts to special status plants and include: avoiding or
The URL can be used to link to this page
Your browser does not support the video tag.