My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 3 <br />230 kV Transmission Line Project FEIS Affected Environment <br /> PAGE 3-290 <br />3.14.4.16 Route Segment NNR-7 <br />Route Segment NNR-7 crosses several un-named intermittent or ephemeral drainages. Route Segment <br />NNR-7 also parallels Johnson Creek. At its nearest point, Johnson Creek lies approximately one-half mile <br />south of Route Segment NNR-7. Johnson Creek is perennial and contains forested riparian vegetation. <br />3.14.4.17 Route Segment NNR-8 <br />The Route Segment NNR-8 Project study area crosses the Columbia River below Wanapum Dam. The <br />Columbia is a lacustrine wetland type. Within the Route Segment NNR-8 Project study area, some <br />riparian vegetation is present along the edges of the Columbia River. <br />3.14.4.18 Route Segment MR-1 <br />The Project study area for Route Segment MR-1 crosses several un-named intermittent and ephemeral <br />drainages. This route segment’s ROW also crosses Scorpion Coulee Creek, which is intermittent and <br />contains little to no riparian vegetation. An unnamed irrigation canal is located along the south side of <br />Badger Pocket at the edge of JBLM YTC boundary.
The URL can be used to link to this page
Your browser does not support the video tag.