My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 3 <br />230 kV Transmission Line Project FEIS Affected Environment <br /> PAGE 3-283 <br />operating fish hatcheries, construction and operation of fish passage facilities, and adopting and <br />implementing shoreline and recreation management plans (FERC 2008). Grant County PUD distributes <br />the power from these two dams and other power resources at production cost through long-term contracts <br />with 22 regional utilities in Washington, Oregon, and Idaho. <br />Flowage Easements <br />Any easement is a right or privilege by one to use the land of another for a specific purpose. A flowage <br />easement usually consists of the perpetual right, power, privilege, and easement to overflow, flood, and <br />submerge the lands affected; reserving, however, to the fee owner of the lands all such rights and <br />privileges as may be used and enjoyed without interfering with or abridging the rights granted in the <br />flowage easement. <br />An owner of land is entitled to "just compensation" whenever the waters of a stream or lake are altered or <br />impounded so as to inundate, saturate, or erode his land. This applies to lands not previously affected by <br />natural flooding, as well as to those which have been subject to natural flooding, where water level <br />alteration or artificial impoundment aggravates this natural flooding condition. Such alteration constitutes <br />a "taking" of the land involved and the taker must either purchase the affected land in fee or acquire a <br />flowage easement. <br />Flowage easements associated with the operation of the Priest Rapids Hydroelectric facility and held by <br />the Grant County PUD are located around the shoreline perimeter of the Priest Rapids Reservoir. <br />Irrigation Canals <br />There are several canals, wasteways, and other irrigation facilities in the Project study area. The Selah- <br />Moxee Irrigation Canal, located east of the Pomona Heights Substation, crosses Sage Trail Road and is <br />managed and operated by the Selah Moxee Irrigation District. The Roza Canal is managed by the Roza <br />Irrigation District, and is located along the Yakima River. An unnamed irrigation pump ditch owned and <br />operated by Kittitas Reclamation District is located along the south side of Badger Pocket at the boundary <br />of JBLM YTC. The Wahluke Branch Canal, Saddle Mountain Wasteway, and the Mattawa Canal are all <br />managed and operated by South Columbia Basin Irrigation District. <br />3.14.2.2 Groundwater <br />Groundwater <br />Groundwater in the Project study area occurs within four principal aquifers: surficial sedimentary units <br />(principally Ellensburg Formation), Saddle Mountains Basalt, Wanapum Basalt, and Grande Ronde <br />Basalt. The location of the four principal aquifers is dependent upon rock type, geologic structure, and <br />topography. Within JBLM YTC reported subsurface depths of groundwater range from 20 feet in stream <br />valleys to more than 200 feet at higher elevations (U.S. Department of the Army [Army] 2010). <br />Wells <br />Drinking water supplies in the Project study area are met primarily by wells that pump groundwater. <br />Individual domestic wells tap permeable portions of a surficial sedimentary aquifer, while most municipal <br />wells tap deeper aquifers in basalt (lava bedrock) and sedimentary interbed layers that underlay the <br />sediments (Pacific Groundwater Group 2011). The drinking water supply for JBLM YTC is provided <br />entirely from groundwater sources. Six wells provide water for three permitted drinking water distribution <br />systems within JBLM YTC (Army 2010). <br />For more than 100 years, irrigated agriculture has existed in the region, with farmers applying fertilizers <br />and pesticides to attempt to maximize crop yields. In the past 25 to 30 years, large scale dairy operations <br />have joined feedlots in the area, significantly increasing the amount of nitrates present. For much of the
The URL can be used to link to this page
Your browser does not support the video tag.