My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 1 <br />230 kV Transmission Line Project FEIS Purpose and Need <br /> PAGE 1-13 <br />1.7 PURPOSE AND NEED <br />1.7.1 Bureau of Land Management Purpose and Need <br />Pacific Power has submitted a ROW application to construct, operate, and maintain a 230 kV <br />transmission line across BLM managed public lands. The BLM’s action, processing the ROW <br />application, is needed in order for the BLM to comply with applicable law governing applications for <br />ROWs over public lands. The purpose of the BLM’s action is to grant, grant with conditions, or to deny <br />the ROW application. <br />The Federal Land Policy and Management Act of 1976 (FLPMA) provides that ROWs may be granted <br />over public lands for systems of generation, transmission, and distribution of electric energy (43 U.S.C. § <br />1761(a) (4)). BLM regulations found at 43 CFR Part 2800 govern BLM ROW grant applications and <br />ROW content. <br />Pursuant to 43 CFR Part 2801.2, it is BLM’s objective to grant ROWs in accordance with applicable <br />BLM regulations and to control the use of ROWs on public lands in a manner that: <br />1. Protects the natural resources associated with public lands and adjacent lands, whether private or <br />administered by a government entity; <br />2. Prevents unnecessary or undue degradation to public lands; <br />3. Promotes the use of ROWs in common considering engineering and technological compatibility, <br />national security, and land use plans; and <br />4. Coordinates, to the fullest extent possible, all BLM actions under the regulations in this part with <br />state and local governments, interested individuals, and appropriate quasi-public entities. <br />Pursuant to 43 CFR Part 2805.10, the BLM may include in any ROW grant such terms, conditions, and <br />stipulations, which are in the public interest. <br />1.7.2 U.S. Army Yakima Training Center Purpose and Need <br />Pacific Power has submitted a ROW application to construct, operate, and maintain a 230 kV <br />transmission line across JBLM YTC administered lands. The JBLM YTC action on this proposal would <br />be to grant the use of Army-administered lands. <br />The JBLM YTC need for action, to respond to Pacific Power’s ROW application, arises from Army <br />Regulation 405-80, Management of Title and Granting Use of Real Property, October 1997 and 32 CFR <br />Part 643. Army Regulation 405-80 identifies the process under which Army controlled real property can <br />be made available for non-Army purposes to private parties (e.g., Pacific Power). <br />32 CFR Part 643 sets forth the authority, policy, responsibility and procedure for making military real <br />estate under the control of the Army available for use by other military departments, federal agencies, <br />state and local governmental agencies, private organizations, or individuals. <br />1.7.3 Bonneville Power Administration Purpose and Need <br />Pacific Power has submitted a request to BPA to interconnect the proposed Project to the FCRTS at <br />BPA’s existing Vantage Substation. BPA’s need for action, to respond to Pacific Power’s interconnection <br />request, arises from the procedures and processes for transmission interconnection requests that <br />implement BPA’s OATT. BPA will consider the following objectives or purposes in finalizing the <br />agreement with Pacific Power to allow interconnection to the Vantage Substation.
The URL can be used to link to this page
Your browser does not support the video tag.