My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 3 <br />230 kV Transmission Line Project FEIS Affected Environment <br /> PAGE 3-211 <br />route segment would potentially be intermittently viewed at a distance in the middleground and <br />background, primarily, as it parallels I-82. As the line follows the boundary of the JBLM YTC, the route <br />segment would be within the immediate foreground and foreground view of residences located on the <br />southwest side of Badger Pocket (KOP 19 - Badger Pocket: Silka Road; KOP 20 - Upper Badger Pocket <br />Road). The Umtanum Ridge Water Gap NNL (access road on the east side of SR-821) is located in the <br />background within the Project study area and views are typically screened by topography. <br />The visual influence of developed features is limited to the I-82 corridor, including the parking areas of <br />the MR Viewpoints. No existing transmission lines occur in the vicinity of this route segment except at <br />each end of the route segment where it diverges or converges with the existing Pomona-Wanapum 230 <br />kV transmission line. However, a distribution line that services communication facilities west of the MR <br />Viewpoint and a cell tower are located west of I-82 within the viewshed of the I-82 corridor.
The URL can be used to link to this page
Your browser does not support the video tag.