My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 3 <br />230 kV Transmission Line Project FEIS Affected Environment <br /> PAGE 3-182 <br />3.7.4 Route Segment Specific Considerations <br />3.7.4.1 Route Segment 1a/NNR-1 <br />This Route Segment parallels the existing Pomona-Wanapum 230 kilovolt (kV) transmission line out of <br />the Pomona Heights Substation for about 4,400 feet and turns north adjoining and paralleling within the <br />existing PacifiCorp electrical distribution line easement for the private section of Sage Trail Road for <br />approximately two miles. Project access would occur from the existing Pomona-Wanapum 230 kV <br />transmission line access road and the private Sage Trail Road. <br />3.7.4.2 Route Segment 1b <br />Route Segment 1b would extend onto the JBLM YTC parallel to an existing fire break road along the <br />JBLM YTC boundary. <br />3.7.4.3 Route Segment 1c <br />The transportation network in Kittitas Canyon where Route Segment 1c parallels and ascends Yakima <br />Ridge is very sparse. Roza Hill Drive, Summerset Drive, Maple Place, Bohoskey Drive, Lamb Road, and <br />E. Norman Road are existing unpaved roads that would provide access along Route Segment 1c. As the <br />route extends south of the JBLM YTC, it turns east and would parallel Mieras Road, a two-lane paved <br />road, for approximately 1.25 miles until the road ends. <br />3.7.4.4 Route Segment 2a <br />The road network in the area of Route Segment 2a is also very sparse and generally undeveloped, <br />consisting of a limited number of dirt roads and two-track roads that extend from SR-24 and Deeringhoff <br />Road across rangeland and cultivated farmland. <br />3.7.4.5 Route Segment 2b <br />This short segment is only accessible from private, 2-track roads extending from Deeringhoff Road and <br />from a fire break road located at the perimeter of JBLM YTC. <br />3.7.4.6 Route Segment 2c <br />This route segment crosses private land that is generally inaccessible by the public. The Bonneville Power <br />Administration (BPA) Midway-Moxee 115 kV transmission line and the PacifiCorp Union Gap – <br />Midway 230 kV transmission line have existing access roads generally parallel to the lines within the <br />existing ROW of the lines and accessible from SR 24. <br />3.7.4.7 Route Segment 2d <br />This route segment would be accessed from two-track road on private lands extending north from SR-24 <br />and Cold Creek Road following the Umtanum Ridge. This area is mostly privately owned land and <br />inaccessible by the public. <br />3.7.4.8 Route Segment 3a <br />Route Segment 3a would be accessible from the two-lane paved access road to the Vantage Substation <br />that extends from SR-243. <br />3.7.4.9 Route Segment 3b <br />Route Segment 3b runs along the western banks of the Columbia River. In Benton County, access to this <br />route segment would be from BPA’s paved access road to the Midway Substation that extends from <br />SR-24 and across an orchard access road to a point where the road transitions into the abandoned <br />Chicago, Milwaukee, St. Paul, and Pacific railroad bed ROW. In Kittitas County, this route segment <br />would be located parallel to Huntzinger Road to the south end of the Auvil Fruit Company. Just south of <br />the Wanapum Dam, the route segment crosses the Columbia River to the Vantage Substation. The route
The URL can be used to link to this page
Your browser does not support the video tag.