My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 3 <br />230 kV Transmission Line Project FEIS Affected Environment <br /> PAGE 3-169 <br />within 0.25 mile of the river. On the north end of the route, the route segment is adjacent to the Columbia <br />NWR and the Lower Crab Creek Unit of the Columbia Basin Wildlife Area, but does not cross either. <br />3.6.4.11 Route Segment NNR-2 <br />Route Segment NNR-2 is located within the JBLM YTC, which has been identified as an IBA. <br />3.6.4.12 Route Segment NNR-3 <br />Route Segment NNR-3 crosses the Yakima River Cliffs and Umtanum Ridge ACEC. Route Segment <br />NNR-3 also crosses additional land that is proposed in the BLM Eastern Washington RMP (update) to be <br />included in the Yakima River Canyon and Umtanum Ridge ACEC. The Selah Cliffs NAP is located <br />within the Project study area on the west side of this route segment. <br />3.6.4.13 Route Segment NNR-4 <br />The portion of Route Segment NNR-3 that is located within the JBLM YTC has been identified as an <br />IBA. <br />3.6.4.14 Route Segment NNR-5 <br />Route Segment NNR-5 is located within the JBLM YTC, which has been identified as an IBA. <br />3.6.4.15 Route Segment NNR-6 <br />Route Segment NNR-6 is located within the JBLM YTC, which has been identified as an IBA. <br />3.6.4.16 Route Segment NNR-7 <br />Route Segment NNR-2 is located within the JBLM YTC, which has been identified as an IBA. <br />3.6.4.17 Route Segment NNR-8 <br />Route Segment NNR-3 crosses land that is proposed in the BLM Eastern Washington RMP (update) to be <br />designated as the Huntzinger Road ACEC. The planned Wanapum NAP is also crossed by this route <br />segment. <br />3.6.4.18 Route Segment MR-1 <br />The portion of Route Segment Manastash Ridge (MR) 1 that is located within the JBLM YTC has been <br />identified as an IBA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.