My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 3 <br />230 kV Transmission Line Project FEIS Affected Environment <br /> PAGE 3-127 <br />IDENTIFIER AND LEASE TYPE PUBLIC LANDS LOCATION (TOWNSHIP/RANGE/SECTION) <br />-WAW 05045:ROW for BPA access road <br />-WAOR 8634: ROW for Pacific Power 230 kV Pomona-Wanapum <br />transmission line <br />-WAOR 45722: ROW for Puget Sound Power 230 kV transmission line <br />-WAOR 55771: ROW for Kittitas County PUD 34.5 kV transmission line <br />-WAOR 59673: oil and gas lease to Delta Petroleum et al. <br />T.16N, R.23E, Section 20 <br />-WAW 05880: ROW for BPA 500 kV Hanford-Vantage transmission <br />line <br />-WAOR 17388: ROW for United Telephone microwave reflector <br />-WAOR 40183: ROW for Grant Co. PUD 7.62 kV aerial electric <br />distribution line <br />T.15N, R.24E, Sections 18, 20, 21, 22 <br />-WAOR 67856: Wind testing and monitoring area ROW, including <br />authorization for placement of meteorological towers <br />T.15N, R.23E, Sec. 11: SE1/4, Sec. 12 (all), Sec. <br />13 (all), Sec. 14: E1/2, Sec. 24: N1/2 <br />T.15N, R.24E, Sec. 6: S1/2NE1/4, SE1/4NW1/4, <br />E1/2SW1/4, SE1/4, Lots 1-7; Sec. 7: E1/2, <br />E1/2W1/2, Lots 1 - 4; , Sec. 8: (all), Sec. 10: <br />W1/2E1/2, SW1/4, Sec. 12: N1/2, SW1/4, Sec. <br />13: (all), Sec. 14: (all), Sec. 16: (all), Sec. 18: <br />E1/2, E1/2W1/2, Lots 1-4, Sec. 20: N1/2, <br />N1/2S1/2, Sec. 21 (all), Sec. 22: N1/2, N1/2S1/2, <br />Sec. 24: N1/2. <br /> <br />Table 3.4-7 Bureau of Reclamation Non-Grazing Leases <br />DESCRIPTION PUBLIC LANDS LOCATION (SECTION) <br />T. 13N, R.24E <br />Midway Line – Grand Coulee; Remaining parcels transferred to AEC Section 2 <br />Midway Line – Columbia Mattawa Drain – Reclamation Facility Section 3 <br />Grant County Material Site Section 4 <br />880 feet River Network Contract 6-7-16-L3005 Section 8 - N1/2NE1/4 <br />Material Site License to Washington State 9-17-67-7955t14, Lots 1 through 4 to <br />AEC Section 10 <br />Lots 1 and 2 to AEC Section 11 <br />T. 14N, R.24E <br />Midway Grand Coulee Power Line Section 2 <br />Midway Grand Coulee Power Line <br />Proposed N.P. Railroad 100 foot ROW, no documentation that this was ever <br />developed further. <br />Section 3 <br />Midway Grand Coulee Power Line Section 11 <br />Midway Grand Coulee Power Line Section 23 <br />T. 15N, R.23E <br />Facility only Section 22 <br />T. 15N, R.24E <br />Access Road easement W1/2NW1/4 <br />Grant County PUD power line W1/2NW1/4 Section 27 <br />Administered by Washington State Department of Fish and Wildlife. Section 29 <br />Priest Rapids Transmission Line <br />Hanford-Vantage Transmission Line All Sections
The URL can be used to link to this page
Your browser does not support the video tag.