Laserfiche WebLink
Vantage to Pomona Heights Table of Contents <br />230 kV Transmission Line Project FEIS October 2016 <br /> PAGE xiv <br />TABLE 4.3-1 WILDLIFE RESOURCE SENSITIVITY CLASSIFICATION ................................................. 4-54 <br />TABLE 4.3-2 SAGE-GROUSE RESOURCE SENSITIVITY CLASSIFICATION .......................................... 4-54 <br />TABLE 4.3-3 SUMMARY OF IMPACTS TO WILDLIFE RESOURCES ..................................................... 4-55 <br />TABLE 4.3-4 SUMMARY OF DISTURBANCE TO HABITAT TYPE BY ROUTE SEGMENT ...................... 4-61 <br />TABLE 4.3-5 SUMMARY OF NEW TRANSMISSION STRUCTURES THAT WOULD BE INSTALLED BY <br />ROUTE SEGMENT ......................................................................................................... 4-66 <br />TABLE 4.3-6 MILES OF CENTERLINE WITHIN 4 MILES OF ACTIVE GREATER SAGE-GROUSE LEKS 4-72 <br />TABLE 4.3-7 SUMMARY OF DISTURBANCE TO DESIGNATED GREATER SAGE-GROUSE MANAGEMENT <br />UNITS (ACRES) AND THE PERCENT (%) OF TOTAL DISTURBANCE THAT WOULD OCCUR <br />WITHIN EACH MANAGEMENT AREA ........................................................................... 4-81 <br />TABLE 4.3-8 SUMMARY OF SAGE-GROUSE HABITAT WITHIN THE EIGHT-MILE WIDE ANALYSIS <br />AREA (ACRES) AND DISTURBANCE (ACRES) TO SAGE-GROUSE HABITAT BY ROUTE <br />SEGMENT ..................................................................................................................... 4-83 <br />TABLE 4.3-9 IMPACTS TO SPECIAL STATUS WILDLIFE AND IMPACT SUMMARY OF ACTION <br />ALTERNATIVES .......................................................................................................... 4-125 <br />TABLE 4.4-1 LAND USE RESOURCES SENSITIVITY CLASSIFICATION ............................................. 4-128 <br />TABLE 4.4-2 LONG-TERM PROJECT IMPACTS ON LAND USE BY ROUTE SEGMENT (MILES) ......... 4-130 <br />TABLE 4.4-3 VANTAGE-POMONA HEIGHTS TRANSMISSION PROJECT MITIGATION MEASURES ... 4-145 <br />TABLE 4.4-4 LONG-TERM LAND USE DISTURBANCE AND ACTION ALTERNATIVE RESIDUAL IMPACT <br />SUMMARY ................................................................................................................. 4-147 <br />TABLE 4.5-1 RECREATION RESOURCE SENSITIVITY CLASSIFICATION .......................................... 4-149 <br />TABLE 4.5-2 PROJECT RECREATION IMPACT MITIGATION MEASURES ......................................... 4-155 <br />TABLE 4.5-3 RESIDUAL IMPACTS TO RECREATION BY ROUTE SEGMENT ...................................... 4-155 <br />TABLE 4.5-4 RECREATION RESOURCES RESIDUAL IMPACT SUMMARY BY ACTION ALTERNATIVE ....... <br /> ................................................................................................................................... 4-156 <br />TABLE 4.7-1 TRANSPORTATION RESOURCE SENSITIVITY CLASSIFICATION .................................. 4-165 <br />TABLE 4.7-2 NEW ROAD CONSTRUCTION SUMMARY BY ROUTE SUMMARY ................................ 4-181 <br />TABLE 4.7-3 NEW ROAD CONSTRUCTION SUMMARY BY ACTION ALTERNATIVE ......................... 4-185 <br />TABLE 4.8-1 LANDSCAPE (LANDFORM AND VEGETATION) CONTRAST MATRIX - OVERHEAD DESIGN <br />OPTION ...................................................................................................................... 4-189 <br />TABLE 4.8-2 LANDSCAPE (LANDFORM AND VEGETATION) CONTRAST MATRIX - UNDERGROUND <br />DESIGN OPTION ......................................................................................................... 4-189 <br />TABLE 4.8-4 PROJECT CONTRAST MATRIX .................................................................................... 4-190 <br />TABLE 4.8-3 STRUCTURE CONTRAST MATRIX .............................................................................. 4-192 <br />TABLE 4.8-5 SCENIC QUALITY IMPACTS ........................................................................................ 4-197 <br />TABLE 4.8-6 HIGHLY SENSITIVE VIEW IMPACTS ........................................................................... 4-197 <br />TABLE 4.8-7 MODERATELY SENSITIVE VIEW IMPACTS ................................................................. 4-198 <br />TABLE 4.8-8A RESIDUAL VISUAL IMPACT SUMMARIES BY ROUTE SEGMENT AND DESIGN OPTION ....... <br /> ................................................................................................................................... 4-219 <br />TABLE 4.8-8B RESIDUAL VISUAL IMPACT SUMMARIES BY ROUTE SEGMENT AND DESIGN OPTION ....... <br /> ................................................................................................................................... 4-220 <br />TABLE 4.8-9 VANTAGE-POMONA HEIGHTS TRANSMISSION PROJECT MITIGATION MEASURES ... 4-221 <br />TABLE 4.8-10 PROJECT RESIDUAL IMPACTS BY ROUTE SEGMENT AND DESIGN OPTION ............... 4-222