Vantage to Pomona Heights Table of Contents <br />230 kV Transmission Line Project FEIS October 2016 <br /> PAGE xi <br />TABLES <br />TABLE 1-1 AUTHORIZATIONS, PERMITS, REVIEWS, AND APPROVALS .......................................... 1-17 <br />TABLE 1-2 ISSUES RAISED BY THE PUBLIC AND GOVERNMENT AGENCIES DURING SCOPING ..... 1-22 <br />TABLE 2-1 ACTION ALTERNATIVE COMPARISON SUMMARY ......................................................... 2-9 <br />TABLE 2-2 OVERHEAD DESIGN CHARACTERISTICS OF THE PROPOSED VANTAGE-POMONA <br />HEIGHTS 230 KV TRANSMISSION LINE PROJECT ........................................................ 2-13 <br />TABLE 2-3 ACCESS LEVELS AND GROUND DISTURBANCE (OVERHEAD AND UNDERGROUND <br />CONSTRUCTION STANDARDS) ..................................................................................... 2-22 <br />TABLE 2-4 OVERHEAD TRANSMISSION LINE CONSTRUCTION ESTIMATED PERSONNEL AND <br />EQUIPMENT ................................................................................................................. 2-31 <br />TABLE 2-5 UNDERGROUND DISTURBANCE ASSUMPTIONS ........................................................... 2-45 <br />TABLE 2-6 ROUTE SEGMENT LENGTHS ......................................................................................... 2-59 <br />TABLE 2-7 ACCESS ROAD DISTURBANCE BY ROUTE SEGMENT ................................................... 2-85 <br />TABLE 2-8 ACCESS ROAD DISTURBANCE BY ACTION ALTERNATIVE .......................................... 2-86 <br />TABLE 2-9 AREAS WITH SHORT-TERM, TEMPORARY DISTURBANCE - OVERHEAD TRANSMISSION <br />LINE CONSTRUCTION (BY ROUTE SEGMENT) .............................................................. 2-87 <br />TABLE 2-10 AREAS WITH SHORT-TERM, TEMPORARY DISTURBANCE - OVERHEAD TRANSMISSION <br />LINE CONSTRUCTION (BY ACTION ALTERNATIVE) .................................................... 2-88 <br />TABLE 2-11 AREAS WITH SHORT-TERM, TEMPORARY DISTURBANCE - UNDERGROUND <br />TRANSMISSION LINE CONSTRUCTION (BY ROUTE SEGMENT AND ACTION <br />ALTERNATIVE) ............................................................................................................ 2-88 <br />TABLE 2-12 AREAS WITH LONG-TERM, PERMANENT DISTURBANCE - OVERHEAD TRANSMISSION <br />LINE CONSTRUCTION (BY ROUTE SEGMENT) ............................................................. 2-89 <br />TABLE 2-13 AREAS WITH LONG-TERM, PERMANENT DISTURBANCE - OVERHEAD TRANSMISSION <br />LINE CONSTRUCTION (BY ACTION ALTERNATIVE) .................................................... 2-90 <br />TABLE 2-14 AREAS WITH LONG-TERM, PERMANENT DISTURBANCE - UNDERGROUND <br />TRANSMISSION LINE CONSTRUCTION ......................................................................... 2-91 <br />TABLE 2-15 TOTAL DISTURBANCE BY ROUTE SEGMENT ............................................................... 2-91 <br />TABLE 2-16 TOTAL DISTURBANCE BY ACTION ALTERNATIVE ...................................................... 2-92 <br />TABLE 2-17 ACTION ALTERNATIVE COMPARISONS: LAND USE AND TRANSPORTATION RESOURCES . <br /> ..................................................................................................................................... 2-93 <br />TABLE 2-18 ACTION ALTERNATIVE COMPARISONS: RECREATION AND VISUAL RESOURCES ....... 2-94 <br />TABLE 2-19 ACTION ALTERNATIVE COMPARISONS: WILDLIFE AND VEGETATION RESOURCES ... 2-95 <br />TABLE 2-20 ACTION ALTERNATIVE COMPARISONS: CULTURAL, WATER, AND GEOLOGICAL <br />RESOURCES ................................................................................................................. 2-97 <br />TABLE 3.2-1 SUMMARY OF VEGETATION COVER TYPES (ACRES) WITHIN THE PROJECT STUDY AREA <br />BY ROUTE SEGMENT ..................................................................................................... 3-5 <br />TABLE 3.2-2 NOXIOUS WEEDS SPECIES DOCUMENTED IN PROJECT AREA ....................................... 3-8 <br />TABLE 3.2-3 TOTAL AMOUNT OF FEDERAL AND WSDOT LAND SURVEYED COMPARED WITH THE <br />TOTAL AMOUNT OF LAND PRESENT WITHIN THE 150-FOOT SURVEY CORRIDOR1 ..... 3-11 <br />TABLE 3.2-4 FEDERALLY LISTED SPECIES SUSPECTED TO OCCUR WITHIN THE PROJECT STUDY AREA <br /> ..................................................................................................................................... 3-13