My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Table of Contents <br />230 kV Transmission Line Project FEIS October 2016 <br />PAGE ix <br />FIGURES <br />FIGURE 1-1 PROJECT LOCATION ....................................................................................................... 1-3 <br />FIGURE 1-2 PROJECT AREA .............................................................................................................. 1-5 <br />FIGURE 2-1 AGENCY PREFERRED ALTERNATIVE AND ROUTE SEGMENTS ...................................... 2-3 <br />FIGURE 2-2 SCHEMATIC ILLUSTRATION OF DEIS ROUTE ALTERNATIVES ...................................... 2-5 <br />FIGURE 2-3 SCHEMATIC ILLUSTRATION OF NNR ALTERNATIVE ..................................................... 2-7 <br />FIGURE 2-4 TYPICAL 230 KV STRUCTURE TYPES .......................................................................... 2-14 <br />FIGURE 2-5 PHOTOGRAPHS OF TYPICAL 230 KV STRUCTURE TYPES ............................................ 2-15 <br />FIGURE 2-6 TYPICAL STRUCTURE ASSEMBLY AND WIRE INSTALLATION ACTIVITIES .................. 2-25 <br />FIGURE 2-7 OPEN CUT TRENCHING (EPRI 2008) ........................................................................... 2-36 <br />FIGURE 2-8 UNDERGROUND CABLE CONSTRUCTION ROW WITH SINGLE CABLE OPEN TRENCH 2-36 <br />FIGURE 2-9 TYPICAL UNDERGROUND VAULT INSTALLATION (EPRI 2008) .................................. 2-37 <br />FIGURE 2-10 TYPICAL DUCT BANK AND ACCESS ROAD SECTION ................................................... 2-42 <br />FIGURE 2-11 TRANSITION STATION AND STRUCTURES (WPSC PHOTO) ......................................... 2-44 <br />FIGURE 2-12 NNR ALTERNATIVE I-82 CROSSING #1: SELAH CREEK REST AREA ............................ 2-63 <br />FIGURE 2-13 NNR ALTERNATIVE I-82 CROSSING #2: EXIT 11 ........................................................ 2-67 <br />FIGURE 2-14 MANASTASH RIDGE SUBROUTE I-82 CROSSING #3: MANASTASH RIDGE .................. 2-69 <br />FIGURE 2-15 JBLM YTC UNDERGROUND ROUTE CONSIDERED AND ELIMINATED ........................ 2-77 <br />FIGURE 2-16 ROUTE ALTERNATIVES CONSIDERED AND ELIMINATED ............................................ 2-81 <br />FIGURE 3.3-1 SAGE-GROUSE PRIORITY AREA FOR CONSERVATION ................................................. 3-55 <br />FIGURE 3.3-2 SAGE-GROUSE OCCURRENCE AND MANAGEMENT ZONES ......................................... 3-57 <br />FIGURE 3.3-3 CONNECTIVITY ZONES IDENTIFIED BY WHCWG MODELING .................................... 3-63 <br />FIGURE 3.3-4 SAGE-GROUSE ESTIMATED POPULATION RANGE AND CORE RANGE (2012-2014) .... 3-65 <br />FIGURE 3.3-5 TIME SERIES OF SAGE-GROUSE ESTIMATED POPULATION RANGES FROM 1989 TO 2014 <br /> ..................................................................................................................................... 3-67 <br />FIGURE 3.3-6 FIRE HISTORY AND JBLM YTC TRAINING AREAS ..................................................... 3-71 <br />FIGURE 3.3-7 YTC SAGE-GROUSE POPULATION TREND (1989-2015) .............................................. 3-73 <br />FIGURE 3.4-1 ARTICULATED PIVOT SYSTEM ILLUSTRATION .......................................................... 3-117 <br />FIGURE 3.4-2 CENTER PIVOT (CIRCLE) IRRIGATION SYSTEM UTILIZED IN THE PROJECT STUDY AREA <br /> ................................................................................................................................... 3-117 <br />FIGURE 3.4-3 ARTICULATED CENTER PIVOT IRRIGATION SYSTEM UTILIZED IN THE PROJECT STUDY <br />AREA ......................................................................................................................... 3-118 <br />FIGURE 3.4-4 WHEEL LINE IRRIGATION SYSTEM UTILIZED IN THE PROJECT STUDY AREA .......... 3-118 <br />FIGURE 3.4-5 WHEEL LINE IRRIGATION SYSTEM UTILIZED IN THE PROJECT STUDY AREA ........... 3-119 <br />FIGURE 3.4-6 SPRINKLER IRRIGATION SYSTEM UTILIZED IN THE PROJECT STUDY AREA.............. 3-119 <br />FIGURE 3.4-7 DRIP IRRIGATION SYSTEM UTILIZED IN THE PROJECT STUDY AREA ........................ 3-120 <br />FIGURE 3.4-8 EXISTING IRRIGATION CANAL IN THE PROJECT STUDY AREA .................................. 3-120 <br />FIGURE 3.9-1 SOCIOECONOMICS PROJECT STUDY AREA ................................................................ 3-215 <br />FIGURE 3.9-2 HISTORICAL UNEMPLOYMENT RATES, PROJECT STUDY AREA COUNTIES AND THE <br />STATE OF WASHINGTON, 2006 - JULY 2015 .............................................................. 3-224 <br />FIGURE 3.9-3 HISTORICAL UNEMPLOYED LABOR FORCE, PROJECT STUDY AREA COUNTIES, 2006 – <br />JULY 2015 .................................................................................................................. 3-225
The URL can be used to link to this page
Your browser does not support the video tag.