Laserfiche WebLink
Vantage to Pomona Heights Chapter 2 <br />230 kV Transmission Line Project FEIS Proposed Action and Alternatives <br /> PAGE 2-92 <br />Table 2-16 Total Disturbance by Action Alternative <br />ALTERNATIVE TOTAL SHORT-TERM DISTURBANCE TOTAL LONG-TERM DISTURBANCE <br />Square Feet Acres Square Feet Acres <br />Alternative A 10,626,414 243.95 4,053,977 93.07 <br />Alternative B 9,818,082 225.39 4,255,480 97.69 <br />Alternative C 10,101,006 231.89 3,686,752 84.64 <br />Alternative D 10,909,338 250.44 3,485,249 80.01 <br />Alternative E 9,869,174 226.57 4,770,492 109.52 <br />Alternative F 10,677,506 245.12 4,568,989 104.89 <br />Alternative G 10,152,099 233.06 4,201,764 96.46 <br />Alternative H 10,960,431 251.62 4,000,261 91.83 <br />NNR Alternative – <br />Overhead Design Option* 6,840,478 157.04 2,041,390 46.86 <br />NNR Alternative – <br />Underground Design <br />Option <br />8,544,458 196.15 2,539,112 58.29 <br />NNR Alternative – MR Subroute 8,043,603 184.66 3,286,763 75.45 <br />*Agency Preferred Alternative