Vantage to Pomona Heights Chapter 2 <br />230 kV Transmission Line Project FEIS Proposed Action and Alternatives <br /> PAGE 2-90 <br />Table 2-13 Areas with Long-term, Permanent Disturbance - Overhead Transmission Line Construction (By Action Alternative) <br />*Agency Preferred Alternative <br />ACTION <br />ALTERNATIVE <br />STRUCTURES <br />TOTAL LONG-TERM STRUCTURE AND WORK AREA DISTURBANCE <br />TANGENT <br />H-FRAME STRUCTURES <br />20″ Diameter <br />Poles (2) + auger holes = 7.5 sq. ft. <br />x 2 = 15 sq. ft. per structure <br />TANGENT SINGLE POLE STRUCTURES <br />24″ Diameter <br />Pole + auger hole = <br />8 sq. ft. per structure <br />ANGLE/DEAD END STRUCTURES <br />30″ Diameter <br />Poles (3) + auger holes + guys = 7 sq. ft. x 3 = 24 <br />sq. ft. per structure <br />STEEL LATTICE <br />4 Footings, 60’x60’ <br />(3,600 sq. ft.) <br />WORK PADS AT EACH STRUCTURE <br />30x40’ (1,200 sq. ft.) <br />>8% slope <br />Square Feet Acres Square Feet Acres Square Feet Acres Square Feet Acres Square Feet Acres Square Feet Acres <br />Alternative A 5,366 0.12 1,112 0.03 792 0.02 7,200 0.17 246,000 5.65 260,470 5.98 <br />Alternative B 4,190 0.10 1,728 0.04 528 0.01 7,200 0.17 205,080 4.71 218,726 5.02 <br />Alternative C 4,200 0.10 1,864 0.04 552 0.01 7,200 0.17 172,320 3.96 186,136 4.27 <br />Alternative D 5,376 0.12 1,248 0.03 816 0.02 7,200 0.17 213,240 4.90 227,880 5.23 <br />Alternative E 3,959 0.09 1,936 0.04 552 0.01 7,200 0.17 213,840 4.91 227,487 5.22 <br />Alternative F 5,135 0.12 1,320 0.03 816 0.02 7,200 0.17 254,760 5.85 269,231 6.18 <br />Alternative G 3,969 0.09 2,072 0.05 576 0.01 7,200 0.17 181,080 4.16 194,897 4.47 <br />Alternative H 5,145 0.12 1,456 0.03 840 0.02 7,200 0.17 222,000 5.10 236,641 5.43 <br />NNR Alternative – <br />Overhead Design Option* 3,780 0.09 336 0.01 768 0.02 7,200 0.17 291,480 6.69 303,564 6.97 <br />NNR Alternative – MR Subroute 4,547 0.10 336 0.01 864 0.02 7,200 0.17 360,360 8.27 373,307 8.57