Laserfiche WebLink
<br />3. Building <br />A. All new construction must meet the International Building Code requirements. <br />4. Roads and Transportation <br />A. The subject project crosses Interstate 82 (1-82), a fully-controlled limited access facility with a <br />posted speed limit of 70 miles per hour. Direct access to 1-82 is prohibited. Access to the <br />proposed project shall be via private property adjacent State Route 821 (SR 821). <br />The applicant is required to contact Mark Kaiser at the WSDOT - South Central Region Office at <br /> (509) 577-1668 to ensure all access connection permits are up to date. <br /> B. Any work to be performed in WSDOT rights-of-way must be coordinated with the South <br />Central Regional Utilities office prior to beginning any work. The South Central Region Utilities <br />Engineer is Jamil Anabtawi. He can be reached at (509) 577-1785. <br /> C. Any work moving more than 100 cubic yards of material will require grading permits through <br />Kittitas County Public Works. <br />5. Fire & Life Safety <br />A. All development, design and construction shall comply with the International Fire Code <br />requirements. <br />6. EIS Adoption <br />A. All development shall conform to the mitigation measures outlined in the Vantage to <br />Pomona Heights Final Environmental Impact Statement published in October 2016. <br />7. Land Control <br />A. The applicant shall acquire permission in writing from all private property owners <br />whose property will be traversed and submit documentation of permission to Kittitas <br />County CDS prior to construction. <br />8. Shorelines <br />A. Any change to the scope of the project that would involve any structural encroachment <br />within 200 feet of a Shoreline of the State, shall require additional permitting through <br />Kittitas County CDS. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Index # 33