Laserfiche WebLink
Consistency with the provisions of the KCC Title 14.04, Building Code: <br />All buildings must be consistent with International Building Codes. <br /> <br />Consistency with the provisions of KCC Title 12, Roads and Bridges: <br />As conditioned, the proposal must be consistent with the provisions of KCC Title 12. <br /> <br />Consistency with the provisions of KCC Title 20, Fire and Life Safety: <br />As conditioned, the proposal must be consistent with the provisions of KCC Title 20. <br /> <br />Agency Comments: <br />The following agencies provided comments during the comment period: Kittitas County Public Health, <br />Washington State Department of Transportation, and Washington State Department of Fish and Wildlife. <br />All comments are on file and available for public review (See Index #25-27). <br /> <br />Public Comments: <br />There was one public comment submitted during the comment period by Michael Scanes representing the <br />Take 5 Home Owners Association (See Index #28 ). Mr. Scanes inquired as to whether the projects <br />intention was to use Roza View Drive for access to the project. Mr. Scanes is concerned that the road could <br />be damaged by heavy equipment if it is used as an access road. Application materials demonstrate an <br />existing project access road north of Roza View Drive, but does not specify that this will be the exclusive <br />access to the project area. <br /> <br />IX. Findings of Fact <br /> <br />1. David Dean, agent for Pacific Power, is proposing the development and continued maintenance <br />of a 27.6 mile 230 kV transmission line to be built in the south east corner of Kittitas County. The <br />transmission line will be used to service a connection between Pacific Powers Pomona Substation in <br />Yakima County and the Bonneville Power Administration’s Vantage Substation in Grant County. <br /> <br />2. The transmission line route will cross into Kittitas County along the southern county line between <br />Highway 821 and Interstate 82, and then continues north-northeast for approximately 6 miles. <br />The transmission line turns northeast a mile before crossing interstate 82 south of Exit 11 and <br />continues that direction to Badger Pocket where it turns east. The transmission line continues east <br />for approximately 14 miles then turns northeast just before crossing the Columbia River. The new <br />transmission line parallels existing transmission line corridors for most of the length through <br />Kittitas County. <br /> <br />3. Site Information <br /> <br />Total Property Size: Approximately 560 acres of ROW within the County <br />Number of Lots: Proposal crosses 43parcels within the county <br />Domestic Water: N/A <br />Sewage Disposal: N/A <br />Power/Electricity: N/A <br />Fire Protection: Fire Districts 4, Fire District 2 (KVFR), and areas outside of Fire <br />Districts <br />Irrigation District: N/A <br /> <br />4. Site Characteristics: <br />The transmission line as proposed will travel 27.6 miles through two zoning districts; Forest and <br />Range, and Commercial Agriculture and across 43 individual parcels. Site characteristics vary <br />along this route. The transmission line will follow existing transmission line corridors for much <br />Index # 33