August 30, 2018 <br /> <br /> <br />Lindsey Ozbolt <br />Kittitas County Planning Official <br />411 North Ruby St., Suite 2 <br />Ellensburg, WA 98926 <br /> <br />RE: WDFW Comments on CU-18-00001 Vantage to Pomona <br /> <br />Dear Ms. Ozbolt, <br /> <br />Thank you for the opportunity to comment on the Conditional Use Permit for the Vantage to <br />Pomona Transmission Line Project (CU-18-0001), “the project”. Washington Department of <br />Fish and Wildlife (WDFW) has reviewed the application and supporting documents. WDFW has <br />previously been engaged in discussions of the project regarding the impacts to terrestrial habitats. <br />Impacts for terrestrial habitat have been resolved through a signed mitigation package. The <br />subject of this letter is potential need for the project to obtain a Hydraulic Project Approval <br />(HPA) for several stream crossings on the transmission line route. <br /> <br />A HPA is needed if the project is expected to that will use, divert, obstruct, or change the natural <br />flow or bed of any of the waters of the state, either perennial or seasonal. For this project, tower <br />construction or more likely access roads along the project line could require an HPA permit. <br />Vegetation removal on the stream banks may also meet the HPA requirement as that activity has <br />the potential to affect the bed and banks. With the materials provided, it is difficult to fully <br />determine if the transmission line and towers fully span all of the waters of the state without need <br />to do work within either the bed or banks of the stream. Some of the roads, both existing and <br />planned appear to cross defined streams and thus further detail is also needed on the work that is <br />planned at these crossings. <br /> <br />Preliminary review based upon the information provided in the application, seems likely that <br />some work may occur in the streams, needing an HPA permit issued by WDFW. Approval of the <br />Conditional Use Permit should include a provision that the applicant work with WDFW to <br />clarify and determine if an HPA is needed for work on the project. If WDFW determines than an <br />HPA permit is required, the applicant must obtain a permit prior to any work involving those <br />stream crossings. Please contact me at (509) 457-9307 or Scott.Downes@dfw.wa.gov, if you <br />have any questions or concerns regarding these comments and thank you again for the <br />opportunity to review and comment on this project. <br /> <br /> <br /> <br />Index # 26