My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A101-2017 Owner Contractor Agmt
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
A101-2017 Owner Contractor Agmt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:34:26 PM
Creation date
12/13/2018 1:34:11 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
j
Item
Request to Approve a Contract for the Bloom Pavilion Upgrades
Order
10
Placement
Consent Agenda
Row ID
50104
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 6N2 Bending Dispute Resolution <br />For any Claim subject to, but not resolved by, mediation pursuant to Article 15 of AIA Document A201-2017, the <br />method of binding dispute resolution shall be as follows: <br />(Check the appropriate box.) <br />[ ] Arbitration pursuant to Section 15.4 of AIA Document A201-2017 <br />[ X ] Litigation in a court of competent jurisdiction <br />[ X ] Other (Sped) <br />Shall be subject to mediation as a condition precedent to binding dispute resolution. <br />If the Owner and Contractor do not select a method of binding dispute resolution, or do not subsequently agree in <br />writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of <br />competent jurisdiction. <br />ARTICLE 7 TERMINATION OR SUSPENSION <br />§ 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document <br />A201-2017. <br />§ 7.1.1 If the Contract is terminated for the Owner's convenience in accordance with Article 14 of AIA Document <br />A201-2017, then the Owner shall pay the Contractor a termination fee as follows: <br />(Insert the amount of, or method for• determining, the fee, if any, payable to the Contractor following a termination for <br />the Owner's convenience.) <br />§ 7.2 The Work maybe suspended by the Owner as provided in Article 14 of AIA Document A201-2017. <br />ARTICLE 8 MISCELLANEOUS PROVISIONS <br />§ 8.1 Where reference is made in this Agreement to a provision of AIA Document A201-2017 or another Contract <br />Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract <br />Documents. <br />§ 8.2 The Owner's representative: <br />(Name, address, email address, and other information) <br />Patt <br />i Johnson, Director <br />Kittitas County Solid Waste <br />925 Industrial Way <br />Ellensburg, WA 98926 <br />§ 8.3 The Contractor's representative: <br />(Name, address, email address, and other information) <br />Brandon Drexler, Vice President <br />Belsaas and Smith Construction, Inc. <br />103 E. 4th Ave., Suite 209 <br />Ellensburg, WA 98926 <br />Init. AIA Document A101T"' — 2017. Copyright©1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The <br />American Institute of Architects. All rights reserved. WARNING: This AIA° Document is protected by U.S. Copyright Law and International Treaties. 6 <br />Unauthorized reproduction or distribution of this AIA° Document, or any portion of it, may result in severe civil and criminal penalties, and will be <br />t prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 14:56:11 ET on 12/12/2018 under Order <br />No.3098409834 which expires on 01/12/2020, and is not for resale. <br />User Notes: (1496466994) <br />
The URL can be used to link to this page
Your browser does not support the video tag.