Laserfiche WebLink
[ X ] Not later than ninety ( 90 ) calendar days from the date of commencement of the Work. <br />[ ] By the following date: <br />§ 3.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are <br />to be completed prior to Substantial Completion of the entire Work, the Contractor shall achieve Substantial <br />Completion of such portions by the following dates: <br />Portion of Work Substantial Completion ®ate <br />N/A <br />§ 3.3.3 Ifthe Contractor fails to achieve Substantial Completion as provided in this Section 3.3, liquidated damages, if <br />any, shall be assessed as set forth in Section 4.5. <br />ARTICLE 4 CONTRACT SUM <br />§ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the <br />Contract. The Contract Sum shall be Three=Hundred Forty Thousand, Nine -Hundred Fifteen Dollars ($ 3409915 ), <br />subject to additions and deductions as provided in the Contract Documents. <br />§ 4.2 Alternates <br />§ 4.2.1 Alternates, if any, included in the Contract Sum: <br />Item Price <br />No. 4 Fire Protection, Full Replacement $94,000 <br />No. 5 Dust Control — Sprinkler System $315000 <br />§ 4.2.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following <br />execution of this Agreement. Upon acceptance, the Owner shall issue a Modification to this Agreement. <br />(Insert below each alternate and the conditions that must be met for the Owner to accept the alternate) <br />Item Price Conditions for Acceptance <br />No. 1 Radiant Fin Tube Heaters $132,000 Availability of Funds <br />Allowances, if any, included in the Contract Sum: <br />(Idem fy each allowance.) <br />Item <br />N/A <br />Price <br />§ 4.4 Unit prices, if any: <br />(Idents the item and state the unit price and quantity limitations, if any, to which the unit price tniJl be applicable.) <br />Item <br />N/A <br />Units and Limitations Price per Unit ($0.00) <br />Liquidated damages, if any: <br />(Insert terms and conditions for liquidated damages, if any.) <br />$250 per calendar day after Substantial Completion date until Work is substantially complete. <br />§ 4.6 Other: <br />(Insert provisions for bonus or other incentives, if any, that might resa/Tt in a change to the Conb•act Sum.) <br />N/A <br />Init. AIA DocumentA101T"' — 2017. Copyright©1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997, 2007 and 2017 by The <br />American Institute ofArchitects. All rights reserved. WARNING: This AIA° Document is protected by U.S. Copyright Law and International Treaties. <br />Unauthorized reproduction or distribution of this AIA° Document, or any portion of it, may result in severe civil and criminal penalties, and will be <br />t prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 14:56:11 ET on 12/12/2018 under Order <br />No.3098409834 which expires on 01/12/2020, and is not for resale. <br />User Notes: (1496466994) <br />3 <br />