My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NtctoSetPHMoeNisbetZirkleFranchiseDodgeRd
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
NtctoSetPHMoeNisbetZirkleFranchiseDodgeRd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:34:11 PM
Creation date
12/13/2018 1:33:39 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Set a Public Hearing to Consider a Franchise Application from Eric S. Moe, Sydney A. Moe, Molly B. Nisbet and Peter B. Nisbet for Dodge Road, Ellensburg
Order
39
Placement
Consent Agenda
Row ID
50104
Type
Hearing notice
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zirkle Fruit Company <br />P.O. Bou 190 <br />Selah, WA 98942 <br />509-697-6101 <br />Franchise Application — Project Description <br />Zirkle Fruit Company proposes to cross under Kittitas County road right-of-way with irrigation pipelines <br />in two locations. The first project will cross under Dodge Road with a 6" irrigation pipe approximately <br />1.1 mile south of Thrall Road. The second project will cross under Payne Road with a 10" irrigation pipe <br />approximately 0.78 mile south of Thrall Road. Each location is marked on attached maps. <br />Zirkle Fruit will trench, back -fill and repave according to Dept. of Public Works specifications and will <br />establish a traffic plan that allows vehicles to safely pass through the site while construction is <br />underway. <br />Zirkle Fruit will employ a licensed contractor, Arrowhead Construction, to perform the work and the <br />project will be completed as soon as possible after the permit is issued, weather permitting. Each <br />project will take less than a day to complete. The contractor will install the pipeline in one-half of the <br />roadway and backfill before opening the other half of the road. This will allow vehicles to pass through <br />the project site without closing the road and detouring traffic. <br />
The URL can be used to link to this page
Your browser does not support the video tag.