My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Exhibits
>
Meetings
>
2018
>
12. December
>
2018-12-04 10:00 AM - Commissioners' Agenda
>
Exhibits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 2:01:56 PM
Creation date
12/11/2018 2:01:24 PM
Metadata
Fields
Template:
Meeting
Date
12/4/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
e
Item
Request to Approve an Agreement to the Lease Water for Irrigation (Treat Lease)
Order
5
Placement
Consent Agenda
Row ID
49668
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br />DEPARTMENT OF <br />ECOLOGY <br />State of Washington <br />APPLICATION DATE <br />October 30, 2017 <br />STATE OF WASHINGTON <br />REPORT OF EXAMINATION <br />FOR WATER RIGHT CHANGE <br />Changed Place of Use <br />Changed Purpose of Use <br />WATER RIGHT CHANGE APPLICATION NUMBER <br />CS4-0114lsb10 <br />PRIORITY DATE OF CLAIM PROPOSED FOR CHANGE CLAIM NUMBER PROPOSED FOR CHANGE <br />June 30, 1872 Court Claim 01141 (S4-84509-J) <br />NAME AND MAILING ADDRESS SITE ADDRESS (IF DIFFERENT) <br />Kittitas County <br />205 West 5th Avenue 10891 Brick Mill Road <br />Ellensburg, WA 98908 Ellensburg, WA 98926 <br />Total Rate and Quantity Authorized for Diversion <br />DIVERSION RATE (cfs) ANNUAL QUANTITY (ac-ft/yr) <br />Primary Reach: 1.08* 249.42* <br />Secondary Reach: 0.70 110.06 <br />cfs = Cubic Feet per Second; a,:.-ft/yr --/\Cl'e•lect per Vear <br />* Under the Subbasln 10 adjudication, the Acquavefla court authorized the use of additional quantities of water when surplus <br />water is available in excess of that needed to satisfy all existing rights. This. water is normally available approximately <br />30-days during spring. Based upon the herein tentative determination, such additional quantities total 0.98 cfs and <br />58.08 acre-feet/year. Thus, the combined annual quantity for lnstream flow and mitigation (Including surplus water) equals <br />249.42 acre-feet. <br />Purpose(s) <br />PURPOSE DIVERSION RATE (cfs) ANNUAL QUANTITY (ac-ft/yr) PERIOD OF USE <br />Primary Reach: 1.08 cfs 249.42* April 15- <br />lnstream Flow and Mitigation August 15** <br />Secondary Reach: 0.70 110.06 April 15- <br />lnstream Flow and Mitigation August 15** <br />** When frost is out of the ground before April 15, the period of use is modified to allow use of water as soo n as frost is out of <br />the ground and water can beneficially be used. <br />Change Report of Examination Page 1 of 15 Water Right File No. CS4-01141sb10
The URL can be used to link to this page
Your browser does not support the video tag.