Laserfiche WebLink
Washington State H~rse Park <br />~ncept Exthnate Material Data 27-Aug-06 <br />Lapsley <br />Material Cost lnstaHed <br />2 1/2" BaHast Rock <br />5/8'' Crushed.Rock <br />Footing Material 70 o/o Sahc:1 30% Clay <br />Porous Asphalt with polymer additive <br />Nike Additive <br />Removal of Top Soil <br />Excavator ( Track .:. suppprt to <br />DumpTrucl< <br />Total <br />Replace Top Soil <br />Excavator ( Track -support to <br />Dump Truck <br />Spread Top Soil <br />Total <br />Remove and Replace Soil <br />Removal of Organic Material <br />Excavator ( Track -~pport to <br />Dump Truck <br />Disposal <br />Total <br />Units <br />Yd <br />Yd <br />Yd <br />Units <br />Yd <br />Yd <br />Ton <br />$ @ Plant Trans. $ ·CY Tons $ per Ton <br />PerTon PerTruck PerTruck PerTruck Ton <br />$10. 75 $8.00 1-5 21.6 <br />$11.60 $8.00 15 21.6 <br />$11.35 $8.00 15 21.6 <br />$1.70 per SF <br />$0.25 PerSF <br />Amoun1 Loads/Hr Ydslhr ·$/hr $/CY <br />10 4 40 $150.00 <br />10 4 40 $75.00 <br />10 4 40 $150.00 <br />10 4 40 $75.00 <br />10 4 40 $150.00 <br />Amount Loads/Hr Vds/hr $/Ton <br />10 3 30 <br />10 3 30 <br />21 3 83 $37 .50 <br />$11.12 <br />$11.97 <br />$11.72 <br />$3.75 <br />$1.88 <br />$5.63 <br />$3.75 <br />$1.88 <br />$3.75 <br />$9.38 <br />Concrete <br />Concrete 5 sack <br />$ Delivered Trans.$ YdsfTruck Matertal$ Total$ $/yd <br />Per CY Per Truck Delivered <br />$77.50 $8.00 11 852.5 $860.50 $78.23 <br />Total$ <br />Install $ Per Ton <br />$2.00 $13.12 <br />$2.00 $13.97 <br />$2.00 $13.72 <br />,