Laserfiche WebLink
Washington State Horse· Park <br />Warm Up Arena <br />Item I Units 1 AVT -Lenath I Width I GSF I Cost/Unit ITotal UnllSI Coatlsf I <br />5/8 11 Minus Tons 334 200 150 30,000 $13:97 $4,666 <br />Porous Asphalt wlth polymer a1 SF 200 150 30,000 $1.70 $51,000 <br />Grading SF 200 150 30,000 $0.048 $1,452 <br />Compaction SF 200 150 30,000 $0.05 $1,500 <br />Footing Material 6" CY 556 200 150 $13.72 $7,622 <br />Nike additive 200 160 30,000 $0.25 $7,500 <br />Sprinkler System EA 1 $2,000.00 $2,000 <br />Fencing LF 900 $12 .00 $10,800 <br />Outdoor .Llghtina EA 2 $4,000.00 $8,000 <br />. <br />Contractors overhead 12.0% <br />Contractors Profit 10.0% <br />To1al Contractor Bid <br />Design Contingency 20.0% <br />Conslructlon Contingency 0.0% <br />Construction Estimate <br />Aug-06 <br />Laos! <br />~ <br />Cost <br />$4,666 <br />$51,000 <br />$1,452 <br />$1,500 <br />$7,622. <br />$7,500 <br />$2,000 <br />$10,800 <br />$8,000 <br />$94,540 <br />11,345 <br />$9,454 <br />$115,339 <br />$23,088 <br />$0 <br />$138,407 <br />$138,SO0