Laserfiche WebLink
Washington State Horse Park <br />Site Development Estimate <br />Item Units Lenath <br />Cleaning & Grubbing SF t,000 <br />Clearing & Grubbing Roads SF 3,100 <br />Remove Organic Material Tons <br />Remove Stumps EA <br />Remove Soil CY 1,000 <br />Relocate Soil CT 200 <br />Storm Drain System Job <br />Road Ballast Rock ITons <br />Parking Lot Ballast Rock Tons <br />Exhibitor Pqrklng Ballast Rock Tons <br />Exhibitors Parking Lot 518" -Tons <br />Grading SF <br />Utility Road Clearing/Grubbing SF 3,100 <br />Removal Organic Material SF 3,100 <br />Remove & Relocate Soil Tons 3,100 <br />Compacting Utility Road SF 3,100 <br />Grading SF 3,100 <br />Utility Road Base Rock Tons 3,100 <br />Utillty Road 5/8 -Tons 3.100 <br />Sub Total <br />Contractors overhead 12.0% <br />Contractors Profit 10.0% <br />Sub Total <br />Design Contingency 20.00/4 <br />Construction Contingency 0.0% <br />rotar <br />Material Take off Length Width <br />Remove Soll 1000 1500 <br />Road Ballast Rock 3,000 24 <br />Paved Parking Ballast Rock 300 150 <br />Exhibitor Parking Ballast Rock 1,400 600 <br />Width Amt <br />1.680 <br />30 <br />30 <br />300 <br />1,680, 65,556 <br />30P 2,222 <br />1 <br />1,375 <br />12,833 <br />600 25,667 <br />600 12,833 <br />1,019,000 <br />20 <br />20 10 <br />20 1,894 <br />20 62,000 <br />20 62,000 <br />20 1,894 <br />20 1,263 <br />Thickness CUFT <br />12 1,500,000 <br />6 38,000 <br />6 22,500 <br />6 420,000 <br />15-Sep-06 <br />.•-Je, <br />$1\Jnit Unit$ GSF Cost/sf Cost <br />1,680,000 $0.06 $105,840 <br />93,000 $0.06 $5,859 <br />$37.50 $1,125 0 $1,125 <br />$161.00 $48,300 0 $48,300 <br />$6.63 $312,500 1,680,000 $312',500 <br />9.38 $20,833 60,000 $20,833 <br />$400,000 $400,000 0 $400,000 <br />13.12 $18,041 0 $18,041 <br />$13.12 $168,378 0 $168,378 <br />$13.12 $336,756 $336,756 <br />$13.97 $179,286 $179,286 <br />$0.048 $49,306 $49,306 <br />$0 62,000 $0.06 $3,720 <br />$0 .00 $0 62,000 $0.06 $3,720 <br />9.38 $17,760 62,000 $17,760 <br />$0.056 $3,441 <br />$0.048 $3,000 <br />13.12 $24,856 62,000 $24,85$ <br />13.97 $17,644 62,000 $17.644 <br />S1 1n0,366 <br />$2.06,444 <br />$172,037 <br />$2,09~,847 <br />$419,769 <br />$0 <br />$2,51 ,8,616 <br />$2,519,000 <br />CY K Factor Tons SF/Grade <br />55,556 1.65 91,667 <br />1,333 1.65 2,200 72,000 <br />833 1.65 1,375 45,000 <br />15,556 1.65 25,667 840,000