Laserfiche WebLink
; . co~~eN o~ t®Nr.> · .. - <br />' <br />BUD.$ too horae stalla 10 be pro'rided. Will build eigltt 80-stall po•t and $6,034,400 <br />beam atrnctnres 4.8-feet wi~e by 3&8.f'eet long with 1a x lHoot <br />•Wla equipped wilh mding gatff. Ten farm water hydrants <br />loca.ted in oaah structttre willproride euy. aaeeo for e.xhibitora . <br />Each barn will lle:ve two location• for-hay atotage and relrienl. <br />Bltotrioll power ud lighting with c-ontrol awilche-a will allow <br />HC'ti.oual lighting oontrol. Each ba.tn will have a c:onorete hone <br />wa,hing fac:ilily . . <br />Waste Bolding ao x 30 foot concrete holding pen with raised concrete (0-foot wide $29,900 <br />Pen wan. on three side• to facilitate the depositing and remoYal uing a <br />front erul loader. <br />EzmyRoada Clearing and bue reek inatalled under the lil• development $451,000 <br />contra.01. Thie project mcludes the instillation of 3" of3/t minu1 <br />loppUJ.g , gnided mdrolled with 2" ofparizlgfor the 3,ooo· x 8Hoot <br />of roadway . .Ra:i.Nd ~b• and a fenee on both &.ide11 of Ute road. A <br />new sign identifying the Washington State Barse Park a inclu~d <br />Wtl.lkwaya 1 'VVmf\md the dnelcpment oftrailt to connect lh• 88-aoru cl $516,100 <br />Pafhwayt ud dffe.lopedlmd withm the Horse Park.it. to the exilling tnil <br />ServtceArus tptem. Iu1allation otw,ilkway, and pathway• between the <br />aonred arena, parking and exhibiton ~ are incl\\<ictd. '!'his <br />trail ,y,tem will ac:c:e,1 approximately 80 additional a.ore, that may <br />be used for eventbig c:oune needa Mltrt ofth.e main campu. <br />Composting Arn An area. zt&ar the 1eniae road wDl b• cleared and grubbed, <br />orgudc material and.1hllllp1 HmDTed lo alearfor a 100 k 80 toot <br />$28,100 <br />pad for the wute material. Dentlopment of the pad will.conmt of <br />8'' ofbue rook, (" of l l/C,'' top rock gradad. and rolled, and the <br />finali:natlllation of 2" of pa.Wig. <br />Livestock The liYaaloclc holcliltg pen will have a. 80 lt 80 foot pll.'.d oonsiati.ng or $25,000 <br />Eol-gPeas 8" ofbue rock,, .. oll l/&" top roclc, andmwly , .. of floor <br />m1torial . Perimeter fonaing wifh control gate, wm complete tl:d.t <br />proj.w:I. <br />Utilltl.e• 'l'ha •cope of lbi1 elel118Jlt is Iha conatructian of a 3,100 feet of ditdl. $728,100 <br />from fhe property lo power trwformer loc:atiou provided by the <br />ceningutilitiee. 'ftlil worl: include• the iutallation of sec:mty <br />lightillg along the roadway, in addition to 1000-feet cf ditvh and <br />piping from. Otec servmgutility et\try on.to lb• lite property and to <br />th.ii aoHrtd art.na. Aho illalu<bid i• a 3,000 foot ditah, mu.hole <br />val~e• aud fire hydrant• for the wtallatton train the Sunaa.dia <br />water, ..wer uidinigalioiuyttem to the end of the are!,\&, Alow <br />voltage commmdeation ud 1eaurity 1J8lem will be iutalled. .