My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution to Adopt SMP Amendments 11-29-2018
>
Meetings
>
2018
>
12. December
>
2018-12-04 10:00 AM - Commissioners' Agenda
>
Resolution to Adopt SMP Amendments 11-29-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 1:11:25 PM
Creation date
11/29/2018 1:11:14 PM
Metadata
Fields
Template:
Meeting
Date
12/4/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution Stating Intent to Adopt Shoreline Master Program Amendments and Authorizing Submittal of Proposed Amendments to Washington State Department of Ecology
Order
11
Placement
Consent Agenda
Row ID
49668
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 6 <br />exemption, or other approval where the proposed project is not excepted under <br />Section 5.1(B)(1)(a) above, and one or more of the following conditions exist: <br /> <br />i. The project area is located within one quarter (1/4) mile from either a protected <br />Native American pre-contact site recorded with DAHP, or a protected historic <br />site that is listed or eligible, or potentially eligible and unevaluated , in the <br />DAHP inventory. <br /> <br />ii. DAHP or an affected Native American t ribe timely comments through the <br />above cultural resources review process (or concurrent permitting or <br />environmental review process, if applicable), and requests an archaeological <br />survey be completed due to the presence of one or more of the following risk- <br />factors: <br /> Documented historic feature(s) on the property or located within one <br />quarter (1/4) mile from the project area; <br /> Previous positive archaeological survey results from a survey on the <br />property or within one quarter (1/4) mile from the project area; or <br /> A tribally-recorded site located within one quarter (1/4) mile of the <br />project area. <br /> <br />iii. DAHP and an affected Native American tribe timely comment through the <br />above cultural resources review process (or concurrent permitting or <br />environmental review process, if applicable), and both DAHP and the affected <br />Native American tribe request that an archaeological survey be completed due <br />to a professional archaeologist’s determination that the project area is in an area <br />that is at high-risk for the presence of archaeological resources (e.g. in an area <br />with high-risk soil deposit types such as historic high-energy soil deposits, or <br />soils with multiple depositional contexts). <br /> <br />iv. The County determines that an archaeological survey is otherwise warranted. <br /> <br />d. Archaeological Survey & Reporting Standards. Archaeological surveys shall be <br />completed by a professional archaeologist . Archaeological survey reports shall <br />conform to DAHP’s then-current reporting standards.1 Both DAHP and affected <br />Native American tribes shall receive copies of completed archaeological survey <br />reports, and have a reasonable opportunity (in no case less than fifteen days) to <br />comment on t heir sufficiency before such reports shall be considered final. Final <br />archaeological survey reports shall be filed with DAHP prior to the County’s issuance <br />of a permit, exemption, or other approval where the proposed project is not exempt <br />under Section 5.1(B)(1)(a). <br /> <br /> <br />1 See Washington State Department of Archaeology and Historic Preservation, Washington State Standards for <br />Cultural Resource Reporting (February 2, 2017), available at <br />http://www.dahp.wa.gov/sites/default/files/CR%20Update%20February%202017.pdf (last visited May 23, 2017).
The URL can be used to link to this page
Your browser does not support the video tag.