Laserfiche WebLink
Engineer's Estimate for the Illinois Well <br />Item Bid Item Quantity Unit Unit Cost Total Number <br />1 Mobilization/Demobilization 1 lump $50,000 $50,000 <br />Install 2-lnch Outside Annular <br />2 Surface Bentonite-Cement Seal 50 $400 $20,000 <br />Grout Surface Seal (20x24 inch) <br />3 Drill Bore Hole for 20-lnch 400 $450 $180,000 Production Casino <br />Furnish and Install 20-lnch <br />4 Nominal Production Casing (no 453 foot $275 $124,575 <br />arouO <br />5 Drill Hole for Screen Assembly 550 $400 $220,000 <br />6 Furnish and Install 12-lnch 425 $200 $85,000 Nominal Pioe and Sand Pack <br />Furnish and Install 12-lnch <br />7 Nominal Screen and Fittings 150 $425 $63,750 <br />and Sand Pack <br />8 Authorized Hourly Work -Well 60 $650 $39,000 Construction <br />9 Authorized Hourly Work -Well 60 hour $400 $24,000 Develooment <br />10 Authorized Standby Time 10 $400 $4,000 <br />11 Furnish, Install, and Remove 1 lump $20,000 $20,000 Pumo <br />Complete Two Pumping Tests <br />12 (8-hr step-rate pumping test and 80 hour $325 $26,000 <br />72-hour constant-rate test) <br />13 Discharge Line 800 foot $1C $8,000 <br />Total: $864,325 <br />Estimated based on 2008 bids adjusted for inflation. <br />AFT