Laserfiche WebLink
Engineer's Estimate for the Illinois Well <br />Item <br />Bid Item <br />Quantity <br />Unit <br />Unit Cost <br />Total <br />Number <br />1 <br />Mobilization/Demobilization <br />1 <br />lump <br />$50,0001 <br />$50,00 <br />Install 2 -Inch Outside Annular <br />2 <br />Surface Bentonite -Cement Seal <br />50 <br />$400 <br />$20,000 <br />Grout Surface Seal (20x24 inch) <br />3 <br />Drill Bore Hole for 20 -Inch <br />400 <br />$45 <br />$180,00 <br />Production Casing <br />Furnish and Install 20 -Inch <br />4 <br />Nominal Production Casing (no <br />453 <br />foot <br />$275 <br />$124,575 <br />rout <br />5 <br />Drill Hole for Screen Assembly <br />550 <br />$400 <br />$220,000 <br />6 <br />Furnish and Install 12 -Inch <br />425 <br />$200 <br />$85,000 <br />Nominal Pipe and Sand Pack <br />Furnish and Install 12 -Inch <br />7 <br />Nominal Screen and Fittings <br />150 <br />$425 <br />$63,75 <br />and Sand Pack <br />8 <br />Authorized Hourly Work — Well <br />60 <br />$650 <br />$39,000 <br />Construction <br />hour <br />9 <br />Authorized Hourly Work— Well <br />60 <br />$400 <br />$24,00 <br />Development <br />10 <br />Authorized Standby Time <br />10 <br />$400 <br />$4,000 <br />11 <br />Furnish, Install, and Remove <br />1 <br />lump <br />$20,000 <br />$20,00 <br />Pum <br />Complete Two Pumping Tests <br />12 <br />(8 -hr step -rate pumping test and <br />80hour <br />$325 <br />$26,00 <br />72 -hour constant -rate test) <br />13 <br />Dischar a Line <br />800 <br />foot <br />$10 <br />$8,000 <br />Total: <br />$864,32 <br />Estimated based on 2008 bids adjusted for inflation. <br />DRAFT <br />