Laserfiche WebLink
<br />Professional Services Agreement (rev. 09/24/2018) <br />Page 15 of 18 <br />EXHIBIT "B" <br /> <br /> COMPENSATION <br /> <br />As full compensation for satisfactory performance of the work, the County shall pay <br />Contractor compensation on a time a materials base: <br /> <br /> <br /> <br />TASK 1: LAGOON PUMP OUT AND APPLICATION <br />Description <br />Equipment Operator <br />UOM <br />hour <br />Price <br />$78.63 <br />Equipment Operator, Overtime hour $117.95 <br />Field Technician hour $53.00 <br />Field Technician Overtime hour $79.50 <br />2500psi Hot Water Pressure Washer day $250.00 <br />Confined Space Entry Gear (Retrieval & Rescue Equip) day $320.00 <br />Level C w/CPF3 or Saranex Suit/Changeout each $65.00 <br />Modified Level D (Tyvec, Gloves and Boots) each $25.00 <br />Pickup/Van/Car/Crew Cab hour $22.00 <br />Stake Body/Utility Truck hour $32.00 <br />Tractor w/Vacuum Trailer hour $95.00 <br />Misc. Handtools day $75.00 <br />Misc. Materials each $200.00 <br />Per Diem / Subsistence day $211.00 <br /> <br />TASK 2: TANK RENTAL AND EQUIPMENT <br /> <br />Amount <br />1 <br />Description <br />DEMOBILIZATION OF TANKS <br />Qty/UOM <br />1 each <br />Days <br />n/a <br />Price <br />$3,519.00 <br />Total <br />$3,519.00 <br />4 FRAC TANK, 21000 GAL 28 day n/a $30.59 $3,426.08 <br />1 MOBILIZATION OF TANKS 1 each n/a $3,519.00 $3,519.00 <br />1 PUMPS, PIPING AND MISC. <br />SUPPLIES <br />1 month n/a $12,532.08 $12,532.08 <br /> Total $22,996.16 <br />