My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-165 Transportation Plan
>
Meetings
>
2018
>
10. October
>
2018-10-16 10:00 AM - Commissioners' Agenda
>
2018-165 Transportation Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2018 11:42:40 AM
Creation date
10/19/2018 11:40:18 AM
Metadata
Fields
Template:
Meeting
Date
10/16/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
s
Item
Request to Approve a Resolution Adopting the Kittitas County Twenty Year (2018-2038) Transportation Plan
Order
19
Placement
Consent Agenda
Row ID
48517
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kittitas County Transportation Element 2018 <br />EXECUTIVE SUMMARY <br />Kittitas County is an area rich in history and a premier destination for outdoor adventure. It is home to the five <br />cities of Ellensburg, Cle Elum, South Cle Elum, Roslyn, and Kittitas, each with their own amenities and charm. This <br />Transportation Element aims to provide a 20-year vision for the County's transportation system, which respects <br />the character of each of its regions, supports anticipated growth, and builds on Kittitas County's development as <br />an attractive place to live, work, and play by supporting safe and comfortable travel by all modes through 2038. <br />The overall vision for Kittitas County's Transportation Element is to provide a safe, balanced, and efficient multi- <br />modal transportation system that serves anticipated local and regional growth. Guidance from County staff and <br />the Policy Working Group helped identify five goals, which serve as the foundation for this Element: <br />• Safe <br />• Efficient and Accommodates Growth, but Respects Rural Character <br />• Complete, Multimodal, and Accommodates Outdoor Recreation <br />• Leveraged by Active Partnerships <br />• Sustainably Funded and Maintains What We Have <br />As stated in the goals, this Transportation Element accommodates growth, but has a strong focus on system <br />maintenance and preservation. The current analysis shows that all but one of the study roadway segments in the <br />County will adequately handle future traffic volumes without capacity improvements. This Element prioritizes <br />preservation of current infrastructure as many of the County's assets are old and need to be rehabilitated to keep <br />them in a state of good repair. The project list included in Chapter 6 includes a total of $127.4 million in potential <br />projects for the 20-year planning horizon. Of this, roughly a third ($36.9 million) is allocated for capacity <br />enhancements, including roadway improvement and expansion, bikeways, and trails and over $90 million is <br />allocated to projects that maintain roadways, bridges, and other infrastructure. The full list of projects can be seen <br />on page 53. <br />Costs of Kittitas County Transportation Plan (20+ years) <br />Project Needs Description Total Cost <br />Road Projects to Accommodate Growth <br />Roadway Investments <br />Nonmotorized <br />Evacuation <br />Bridge Replacement <br />Maintenance and Rehabilitation <br />Planning <br />Note: Costs denoted in millions <br />Source: Fehr & Peers, 201 8 <br />Ensuring LOS standards are met <br />Traffic signals, intersection improvements, capacity enhancements <br />Bicycle and Pedestrian projects, trails <br />Priority evacuation routes <br />Replacement of bridges that are structurally deficient or +75 years <br />Overlay, pavement repair, and bridge repairs <br />Planning studies <br />Total <br />With projected revenues and expenditures for the 20-year planning horizon, the County will have a projected <br />financial shortfall of $91 million. To bridge this gap, a variety of funding strategies are discussed in Chapter 7. <br />While this Transportation Element plans for long-term growth over a 20-year period, it is recommended that it be <br />1!Page <br />$2.4 <br />$19.6 <br />$4.9 <br />$10 <br />$61.6 <br />$28.8 <br />$0.1 <br />$127.4
The URL can be used to link to this page
Your browser does not support the video tag.