My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-165 Transportation Plan
>
Meetings
>
2018
>
10. October
>
2018-10-16 10:00 AM - Commissioners' Agenda
>
2018-165 Transportation Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2018 11:42:40 AM
Creation date
10/19/2018 11:40:18 AM
Metadata
Fields
Template:
Meeting
Date
10/16/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
s
Item
Request to Approve a Resolution Adopting the Kittitas County Twenty Year (2018-2038) Transportation Plan
Order
19
Placement
Consent Agenda
Row ID
48517
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 CAPITAL PLANS <br />This chapter presents the capital program that forms <br />the basis of this Transportation Plan. Collectively, <br />this program adds up to $127 million in <br />transportation improvements to be constructed over <br />the next twenty years as seen in Table 10. <br />Funding to support this program will come from a <br />number of sources including the County's general <br />funds, gas taxes, property taxes, as well as federal <br />and state grants. Since the County's ability to attract <br />outside funding sources is unknown, this project list <br />may reach beyond the 20-year time horizon. <br />The program was developed to create a <br />transportation system that realizes Kittitas County's <br />goal: safe, balanced, and efficient multi-modal <br />transportation system that serves anticipated local <br />and regional growth. This vision is guided by the <br />transportation goals outlined in this Plan: <br />1. Safe <br />2. Efficient and Accommodates Growth, but <br />Respects Rural Character <br />3. Complete, Multimodal, and Accommodates <br />Outdoor Recreation <br />4. Leveraged by Active Partnerships <br />5. Sustainably Funded and Maintains What <br />We Have <br />With these goals in mind, as well as completing the <br />layered networks described in the previous chapter, <br />the project list was developed. <br />Table 11 describes the recommended projects, <br />which represent a balance of safety, maintenance, <br />and operational improvements for all modes. These <br />projects provide a starting point for the County in <br />developing its Six-Year Transportation Improvement <br />Program, which is updated annually and is <br />developed based on knowledge related to project <br />feasibility and funding availability. They were scored <br />based on their ability to meet the goals outlined in <br />Chapter 4 -Transportation Goals and Policies. A full <br />list of scoring criteria is included in Appendix D <br />Table 10. Costs of Kittitas County <br />T rtat· Pl (20 ) • <br />Project Needs Description <br />Road Projects to Ensuring LOS standards <br />Accommodate are met <br />Growth <br />Roadway Traffic signals, <br />Investments intersection <br />improvements, capacity <br />enhancements <br />Non motorized Bicycle and Pedestrian <br />projects, trails <br />Evacuation Priority evacuation <br />routes <br />Bridge Replacement of Bridges <br />Replacement that are structurally <br />deficient or +75 years <br />Maintenance and Overlay, pavement <br />Rehabilitation repair, and bridge <br />repairs <br />Planning Planning studies <br />Total <br />Note: Costs denoted in millions <br />Source: Fehr and Peers, 20 l 8 <br />Total <br />Cost <br />$2.4 <br />$19.6 <br />$4.9 <br />$10 <br />$61.6 <br />$28.8 <br />$0.1 <br />$127.4 <br />52 IP age
The URL can be used to link to this page
Your browser does not support the video tag.