Laserfiche WebLink
1- WATERSHED <br />SCIENCE k ENGINEERING <br />110 Prefontalne Place South, Suite 508 <br />Seattle, WA 98104 <br />Tel. (206) 521-5000 <br />Estimate of Professional Services <br />Prepared for: <br />Kittitae County <br />Project: <br />Reecer Creek <br />Hours <br />Sr.Scien. <br />FEMA Flood Hazard Analysis and Mapping <br />Date: <br />October 9, 2018 <br />Prepared By: <br />Chris Frei <br />TASK DESCRIPTION <br />Prin <br />Sr.Eng.l <br />Sr.Eng.11 <br />Hours <br />Sr.Scien. <br />Jr.Eng. <br />GISSpecialis <br />Contract Admin <br />Totals <br />1. Data Collection and Review <br />10 <br />10 <br />$2,555 <br />2. Field Reconnaissance <br />4 <br />13 <br />13 <br />$4,1]8 <br />3. Survey Coordination-- Stream Cross Sections. Road Crossings <br />05 <br />6 <br />t <br />IM25 <br />4. Hydrologic Analysis— Flocd Discharges <br />2 <br />6 <br />2 <br />$1,549 <br />. Hydraulic Modeling <br />8 <br />2 <br />40 <br />122 <br />$20,752 <br />6. Field Verificationo y rau Ic Modeling <br />12 <br />15 <br />3,375 <br />T Flood Haddard WorkMap <br />2 <br />16 <br />25 <br />,443 <br />8. Study Report <br />6 <br />30 <br />24 <br />,$8.330 <br />9. FEMA Submittal and Coordination <br />2 <br />22 <br />10 <br />$4,813 <br />10, Administration <br />4 <br />8 <br />4 <br />$2,301 <br />Total Hours and Direct Labor Cost (OL) <br />Labor Rate($/M) <br />TOTAL LABOR COST <br />240 <br />$213.59 1 <br />$5,126 <br />20 <br />$189.19 1 <br />$378 <br />134.0 1 <br />$15257 1 <br />$20,444 <br />0.0 1 <br />$12520 1 <br />$0 <br />198.0 <br />$10297 <br />$20.388 <br />1 $104,16 1 <br />$0 <br />$56.53 <br />$226 <br />$54,420 <br />Direct Expense Detail <br />Units Rate Cost <br />Travel to Project Site 936 $0.545 $510 <br />Reproduction and Communication $50 <br />Gage Materials <br />Total $560 <br />Labor <br />Direct Expenses <br />Total <br />