Laserfiche WebLink
Weihl Road Improvements, MP 0.0 to MP 0.27 <br />Nature of the improvement: The grade of the roadway is adjusted to meet a maximum of twelve <br />(12) percent grade. The roadway is widened to a paved hot mix asphalt width of 24 feet. <br />Drainage improvements are constructed along the inside slope of the roadway along with <br />retaining walls on the outside of the roadway. Guardrail is placed at areas of high risk on the <br />outside edge of the roadway. A paved turnaround is constructed at the end of the improvement <br />at intersection with Loping Lane. <br />