My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-160 Task Order 16
>
Meetings
>
2018
>
10. October
>
2018-10-02 10:00 AM - Commissioners' Agenda
>
Res-2018-160 Task Order 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2018 12:00:01 PM
Creation date
10/5/2018 11:59:40 AM
Metadata
Fields
Template:
Meeting
Date
10/2/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
p
Item
Request to Approve a Resolution Authorizing Chair's Signature on KPFF Task Order No.16 for the Big Boulder Creek Bridge Replacement
Order
16
Placement
Consent Agenda
Row ID
48177
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~TTITA..S OOUN"T'Y <br />DEPARTMENT OF PUBLIC WORKS <br />historical aerial photos, flood data, bridge maintenance records, and anecdotal information on <br />past flood events from County maintenance staff. <br />Assumptions: <br />• County will supply relevant data they possess <br />TASK 4.20 -Site Inspection <br />WSE will conduct a one-day field inspection to examine the crossing and Big Boulder Creek. <br />WSE will examine hydraulic and geomorphic characteristics, sediment transport, debris flow <br />potential, lateral erosion, and scour. <br />Assumptions: <br />• NTP is received in time to allow WSE to visit the site before snow fall. <br />TASK 4.30 -Channel Survey <br />WSE will survey up to eight cross sections and a longitudinal profile of the stream channel as <br />part of the site inspection task above. WSE will merge the stream channel data with the <br />County's survey to develop a single topographic base map required for the hydraulic <br />investigation. <br />Assumptions: <br />• County will or has collected detailed topographic data within the road right-of-way. <br />TASK 4.40 -Hydrology <br />WSE will use USGS regional regression equations to estimate annual instantaneous peak design <br />flow rates. The design event for flow and scour will be the 100-year flood and the check flood <br />for potential damage will be the 500-year event. The 500-year event is not the design event, it is <br />solely used to assess risk in-order to identify any remaining significant erosion or scour issues <br />that might need to be addressed in the design. <br />Assumptions: <br />• USGS regression equations will provide reasonable estimates for the 100-year and 500- <br />year annual instantaneous peak flows. If they do not, WSE will use alternative methods <br />to estimate the flows. <br />TASK 4.50 -Hydraulic Analysis
The URL can be used to link to this page
Your browser does not support the video tag.