My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-160 Task Order 16
>
Meetings
>
2018
>
10. October
>
2018-10-02 10:00 AM - Commissioners' Agenda
>
Res-2018-160 Task Order 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2018 12:00:01 PM
Creation date
10/5/2018 11:59:40 AM
Metadata
Fields
Template:
Meeting
Date
10/2/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
p
Item
Request to Approve a Resolution Authorizing Chair's Signature on KPFF Task Order No.16 for the Big Boulder Creek Bridge Replacement
Order
16
Placement
Consent Agenda
Row ID
48177
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />PROJECT DELIVERABLES: <br />1. Alternatives Analysis Memo (Draft and Final) <br />2. 30% Plan Set (Permit set. 3 sheets estimated. Layout, Elevation, Cross-section, <br />structural notes, Cost Estimate) <br />3. 75% Plan Set (6-8 sheets, updated cost estimate, GSP run-list, 30% comment <br />resolution) <br />4. 100% Draft Plans (6-8 sheets, updated cost estimate, PDF of GSP's or run-list and <br />PSE files, pending final review by county, 75% comment resolution and complete <br />PS&E) <br />5. 100% Stamped and Signed Plans (Contract Documents -bid ready) <br />6 . Geotechnical report (Draft PDF and Final PDF+ 3 hard copies) <br />7. One (1) NEPA CE and ECS Form <br />8. One (1) NHPA Section 106 Compliance Memo <br />9. One (1) Biological Assessment (Formal Consultation) <br />10. One (1) SEPA Checklist (Unless Exempt) <br />11. One (1) JARPA package for delivery to USACE, WDFW, and WDOE <br />12. Local Agency correspondence for each permit, approval, or exemption <br />PROJECT ASSUMPTIONS: <br />1. COUNTY to provide KPFF with the project survey base map. County will collect <br />additional data as necessary as requested by KPFF. Contours shall be in at least 2 <br />foot increments and shall preferably extend at least 200 feet to the north, south, east <br />and west of the proposed project limits to include all utilities, driveways, ditches, <br />ROW /property lines and other items which are reasonably likely to impact the bridge <br />layout and design. <br />2. COUNTY will provide Civil roadway and drainage design for the project. <br />3. KPFF to provide specifications related to the PS&E they develop (bridge portion <br />only). <br />4. New bridge is assumed to be designed for one 12 foot lane, and two 2 foot shoulders <br />and no sidewalks. <br />5. Bridge superstructure will have a 2% crown from the centerline of the roadway, or as <br />prescribed by COUNTY Civil roadway design. <br />6. There will be no drains on the bridge. <br />7. Bridge superstructure is assumed to be prefabricated and designed and supplied by <br />the Contractor during construction. <br />8. Load rating report will be provided by bridge superstructure supplier.
The URL can be used to link to this page
Your browser does not support the video tag.