Laserfiche WebLink
Table 4 <br />State and The Nature Conservancy Fuels Reduction Projects <br />Project Name Project Type Acres Status Vear Location Owner <br />Big Creek Pine Planting 148 Complete 2016 Tapash-MTRL-RP TNC Reforestation <br />Cle Elum Ridge-Commercial Thinning 245 Complete 2016 Tapash-Cle Elum TNC Morgan Ridge <br />South Cle Elum Replant 40k Ponderosa <br />Ridge Replanting Pine in South Cle Elum 900 Complete 2016 TNC <br />Ridge Fire Burned area <br />Colockabou 02 U1 Precommercial Thinning 40 Complete 2016 Tapash DNR <br />Brushy Precommercial Thinning 56 Complete 2016 Tapash DNR <br />New Double High Precommercial Thinning 175 Complete 2016 Tapash DNR <br />Clockum Pocket U2 Precommercial Thinning 13 Complete 2016 Tapash DNR <br />Clockum Pocket U3 Precommercial Thinning 85 Complete 2016 Tapash DNR <br />Bacon Ridge U2A Precommercial Thinning 1S Complete 2016 Tapash DNR <br />Wheelbarrow Precommercial Thinning 76 Complete 2016 Tapash DNR <br />Cle Elum Ridge Commercial Thinning 66 Planned TBD Tapash-Cle Elum TNC (Shaft) Ridge <br />Robinson Units Prescribed Burn 728 Planned TBD Tapash-MTRL-RP WDFW <br />Hutchins Units Prescribed Burn 793 Planned TBD Tapash-MTRL-RP WDFW <br />Taneum, Wild Plum <br />Cedar Creek and Forest Enhancement 2,810 Planned TBD Tapash-MTRL-RP DNR <br />Plumback <br />Taneum Forest Enhancement 507 Planned TBD Tapash-MTRL-RP WDFW <br />Robinson Commercial Thinning 1,099 Planned TBD Ta pash-MTRL-RP WDFW <br />- <br />Planned : 6,003 <br />Completed ; 1,753 <br />5.5.6 U.S. Forest Service <br />While there are many challenges for the USFS to actively manage the landscape, advancements have <br />been made in the NEPA process to increase scale and pace of treatments. By using cross boundary <br />treatments, state and TNC planning, and coordinating treatments in the MTRL-RP, USFS can use the <br />NEPA process to have a larger impact on landscape. The timeframe of the NEPA in this area is <br />expected to be complete in June 2019 . While the NEPA is continuing, several smaller treatments on <br />USFS lands have been completed. <br />Community Wildfire Protection Plan 44 September 2018