My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-158 Wildfire Protection Plan
>
Meetings
>
2018
>
10. October
>
2018-10-02 10:00 AM - Commissioners' Agenda
>
Res-2018-158 Wildfire Protection Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2018 11:59:25 AM
Creation date
10/5/2018 11:56:58 AM
Metadata
Fields
Template:
Meeting
Date
10/2/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
m
Item
Request to Approve a Resolution to Adopt the 2018 Community Wildfire Protection Plan and to Authorize the Chair's Signature on the Adoption Page
Order
13
Placement
Consent Agenda
Row ID
48177
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4 <br />State and The Nature Conservancy Fuels Reduction Projects <br />Project Name Project Type Acres Status Vear Location Owner <br />Big Creek Pine Planting 148 Complete 2016 Tapash-MTRL-RP TNC Reforestation <br />Cle Elum Ridge-Commercial Thinning 245 Complete 2016 Tapash-Cle Elum TNC Morgan Ridge <br />South Cle Elum Replant 40k Ponderosa <br />Ridge Replanting Pine in South Cle Elum 900 Complete 2016 TNC <br />Ridge Fire Burned area <br />Colockabou 02 U1 Precommercial Thinning 40 Complete 2016 Tapash DNR <br />Brushy Precommercial Thinning 56 Complete 2016 Tapash DNR <br />New Double High Precommercial Thinning 175 Complete 2016 Tapash DNR <br />Clockum Pocket U2 Precommercial Thinning 13 Complete 2016 Tapash DNR <br />Clockum Pocket U3 Precommercial Thinning 85 Complete 2016 Tapash DNR <br />Bacon Ridge U2A Precommercial Thinning 1S Complete 2016 Tapash DNR <br />Wheelbarrow Precommercial Thinning 76 Complete 2016 Tapash DNR <br />Cle Elum Ridge Commercial Thinning 66 Planned TBD Tapash-Cle Elum TNC (Shaft) Ridge <br />Robinson Units Prescribed Burn 728 Planned TBD Tapash-MTRL-RP WDFW <br />Hutchins Units Prescribed Burn 793 Planned TBD Tapash-MTRL-RP WDFW <br />Taneum, Wild Plum <br />Cedar Creek and Forest Enhancement 2,810 Planned TBD Tapash-MTRL-RP DNR <br />Plumback <br />Taneum Forest Enhancement 507 Planned TBD Tapash-MTRL-RP WDFW <br />Robinson Commercial Thinning 1,099 Planned TBD Ta pash-MTRL-RP WDFW <br />- <br />Planned : 6,003 <br />Completed ; 1,753 <br />5.5.6 U.S. Forest Service <br />While there are many challenges for the USFS to actively manage the landscape, advancements have <br />been made in the NEPA process to increase scale and pace of treatments. By using cross boundary <br />treatments, state and TNC planning, and coordinating treatments in the MTRL-RP, USFS can use the <br />NEPA process to have a larger impact on landscape. The timeframe of the NEPA in this area is <br />expected to be complete in June 2019 . While the NEPA is continuing, several smaller treatments on <br />USFS lands have been completed. <br />Community Wildfire Protection Plan 44 September 2018
The URL can be used to link to this page
Your browser does not support the video tag.