My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoapproveTO16KPFF
>
Meetings
>
2018
>
10. October
>
2018-10-02 10:00 AM - Commissioners' Agenda
>
ResolutiontoapproveTO16KPFF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2018 12:13:04 PM
Creation date
9/27/2018 12:12:28 PM
Metadata
Fields
Template:
Meeting
Date
10/2/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
p
Item
Request to Approve a Resolution Authorizing Chair's Signature on KPFF Task Order No.16 for the Big Boulder Creek Bridge Replacement
Order
16
Placement
Consent Agenda
Row ID
48177
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
°� ` KITTZTA6 COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />gTTITAS COUNTY <br />TASK 3.32 — Geotechnical Reporting <br />Hart Crowser will prepare a geotechnical report to document their findings and <br />recommendations. The geotechnical report will address design and construction issues, <br />including: <br />• Site and boring location plan(s); <br />• Description of subsurface soil, rock, and groundwater conditions; <br />• Site preparation and earthwork recommendations; <br />• Seismic hazards and WSDOT-based seismic design parameters; <br />• Temporary and permanent abutment foundation alternatives, design <br />recommendations, and stability; <br />• Retaining wall alternatives and design parameters; and <br />• Construction considerations. <br />A draft report will be provided to the design team for review and comments. A final <br />report will be prepared that addresses review comments from the design team. <br />TASK 3.33 — Project Management and Meetings <br />Hart Crowser will provide geotechnical project management and support services, <br />including coordinating staff and subcontractors and conducting telephone consultations <br />and email communications with the design team. Hart Crowser will attend up to one <br />meeting at KPFF's office. <br />TASK 3.40 — Construction Support <br />The geotechnical engineer will provide support during construction to respond to RFFs or <br />changes in field conditions. <br />TASK 4 HYDRAULIC DESIGN <br />Watershed Science & Engineering (WSE) will provide hydraulic engineering services for the Big <br />Boulder Creek Bridge Replacement Project in Kittitas County, Washington. WSE will lead the <br />hydraulic engineering portions of the project which will include completing the following tasks. <br />TASK 4.10 — Data Collection and Review <br />WSE will collect and review existing data and information needed to complete the hydraulic <br />investigation. Data will include but not be limited to topographic maps including LiDAR data, <br />
The URL can be used to link to this page
Your browser does not support the video tag.