Laserfiche WebLink
Table 4 <br />State and The Nature Conservancy Fuels Reduction Projects <br />Project Name <br />Project Type <br />Acres <br />Status <br />Year <br />Location <br />Owner <br />Big Creek <br />Pine Planting <br />148 <br />Complete <br />2016 <br />Tapash-MTRL-RP <br />TNC <br />Reforestation <br />Cie Elum Ridge- <br />Tapash-Cle Elum <br />Morgan <br />Commercial Thinning <br />245 <br />Complete <br />2016 <br />Ridge <br />TNC <br />Replant 40k Ponderosa <br />South Cie Elum <br />Pine in South Cie Elum <br />900 <br />Complete <br />2016 <br />TNC <br />Ridge Replanting <br />Ridge Fire Burned area <br />Colockabou 02 U1 <br />Precommercial Thinning <br />40 <br />Complete <br />2016 <br />Tapash <br />DNR <br />Brushy <br />Precommercial Thinning <br />56 <br />Complete <br />2016 <br />Tapash <br />DNR <br />New Double High <br />Precommercial Thinning <br />175 <br />Complete <br />2016 <br />Tapash <br />DNR <br />Clockum Pocket U2 <br />Precommercial Thinning <br />13 <br />Complete <br />2096 <br />Tapash <br />DNR <br />Clockum Pocket U3 <br />Precommercial Thinning <br />85 <br />I Complete <br />2016 <br />Tapash <br />DNR <br />Bacon Ridge U2A <br />Precommercial Thinning <br />15 <br />Complete <br />2016 <br />Tapash <br />DNR <br />Wheelbarrow <br />Precommercial Thinning <br />76 <br />Complete <br />2016 <br />Tapash <br />DNR <br />Cle Elum Ridge <br />Commercial Thinning <br />66 <br />Planned <br />TBD <br />Tapash-Cle Elum <br />TNC <br />(Shaft) <br />Ridge <br />Robinson Units <br />Prescribed Burn <br />728 <br />Planned <br />TBD <br />Tapash-MTRL-RP <br />WDFW <br />Hutchins Units <br />Prescribed Burn <br />793 <br />Planned <br />TBD <br />Tapash-MTRL-RP <br />WDFW <br />Taneum, Wild Plum <br />Cedar Creek and <br />Forest Enhancement <br />2,810 <br />Planned <br />TBD <br />Tapash-MTRL-RP <br />DNR <br />Plumback <br />Taneum <br />Forest Enhancement <br />507 <br />Planned <br />TBD <br />Tapash-MTRL-RP <br />WDFW <br />Robinson <br />Commercial Thinning <br />1.099 <br />Planned <br />TBD <br />Tapash-MTRL-RP <br />WDFW <br />Planned; <br />6,003 <br />Completed <br />1,753 <br />5.5.6 U.S. Forest Service <br />While there are many challenges for the USFS to actively manage the landscape, advancements have <br />been made in the NEPA process to increase scale and pace of treatments. By using cross boundary <br />treatments, state and TNC planning, and coordinating treatments in the MTRL-RP, USFS can use the <br />NEPA process to have a larger impact on landscape. The timeframe of the NEPA in this area is <br />expected to be complete in June 2019. While the NEPA is continuing, several smaller treatments on <br />USFS lands have been completed. <br />Community Wildfire Protection Plan 44 September 2018 <br />