My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoAdoptCWPP
>
Meetings
>
2018
>
10. October
>
2018-10-02 10:00 AM - Commissioners' Agenda
>
ResolutiontoAdoptCWPP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2018 12:16:58 PM
Creation date
9/27/2018 12:12:26 PM
Metadata
Fields
Template:
Meeting
Date
10/2/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
m
Item
Request to Approve a Resolution to Adopt the 2018 Community Wildfire Protection Plan and to Authorize the Chair's Signature on the Adoption Page
Order
13
Placement
Consent Agenda
Row ID
48177
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4 <br />State and The Nature Conservancy Fuels Reduction Projects <br />Project Name <br />Project Type <br />Acres <br />Status <br />Year <br />Location <br />Owner <br />Big Creek <br />Pine Planting <br />148 <br />Complete <br />2016 <br />Tapash-MTRL-RP <br />TNC <br />Reforestation <br />Cie Elum Ridge- <br />Tapash-Cle Elum <br />Morgan <br />Commercial Thinning <br />245 <br />Complete <br />2016 <br />Ridge <br />TNC <br />Replant 40k Ponderosa <br />South Cie Elum <br />Pine in South Cie Elum <br />900 <br />Complete <br />2016 <br />TNC <br />Ridge Replanting <br />Ridge Fire Burned area <br />Colockabou 02 U1 <br />Precommercial Thinning <br />40 <br />Complete <br />2016 <br />Tapash <br />DNR <br />Brushy <br />Precommercial Thinning <br />56 <br />Complete <br />2016 <br />Tapash <br />DNR <br />New Double High <br />Precommercial Thinning <br />175 <br />Complete <br />2016 <br />Tapash <br />DNR <br />Clockum Pocket U2 <br />Precommercial Thinning <br />13 <br />Complete <br />2096 <br />Tapash <br />DNR <br />Clockum Pocket U3 <br />Precommercial Thinning <br />85 <br />I Complete <br />2016 <br />Tapash <br />DNR <br />Bacon Ridge U2A <br />Precommercial Thinning <br />15 <br />Complete <br />2016 <br />Tapash <br />DNR <br />Wheelbarrow <br />Precommercial Thinning <br />76 <br />Complete <br />2016 <br />Tapash <br />DNR <br />Cle Elum Ridge <br />Commercial Thinning <br />66 <br />Planned <br />TBD <br />Tapash-Cle Elum <br />TNC <br />(Shaft) <br />Ridge <br />Robinson Units <br />Prescribed Burn <br />728 <br />Planned <br />TBD <br />Tapash-MTRL-RP <br />WDFW <br />Hutchins Units <br />Prescribed Burn <br />793 <br />Planned <br />TBD <br />Tapash-MTRL-RP <br />WDFW <br />Taneum, Wild Plum <br />Cedar Creek and <br />Forest Enhancement <br />2,810 <br />Planned <br />TBD <br />Tapash-MTRL-RP <br />DNR <br />Plumback <br />Taneum <br />Forest Enhancement <br />507 <br />Planned <br />TBD <br />Tapash-MTRL-RP <br />WDFW <br />Robinson <br />Commercial Thinning <br />1.099 <br />Planned <br />TBD <br />Tapash-MTRL-RP <br />WDFW <br />Planned; <br />6,003 <br />Completed <br />1,753 <br />5.5.6 U.S. Forest Service <br />While there are many challenges for the USFS to actively manage the landscape, advancements have <br />been made in the NEPA process to increase scale and pace of treatments. By using cross boundary <br />treatments, state and TNC planning, and coordinating treatments in the MTRL-RP, USFS can use the <br />NEPA process to have a larger impact on landscape. The timeframe of the NEPA in this area is <br />expected to be complete in June 2019. While the NEPA is continuing, several smaller treatments on <br />USFS lands have been completed. <br />Community Wildfire Protection Plan 44 September 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.