Laserfiche WebLink
BOWERS FIELD -AIRPORT MASTER PLAN <br />Task 15.5 -Summary of Products to Kittitas County <br />The items listed below include distribution to Kittitas County. <br />Product: <br />Draft Working Papers (Chapters) <br />with Track Changes <br />Draft Final Report (Revised Chapters) <br />with Track Changes <br />Preliminary Draft ALP Print Sets <br />Draft Final Master Plan Report <br />Draft Final Master Plan Report <br />Final Draft ALP Prints (bond) & FM Checklist <br />Final ALP Prints (bond) <br />Final ALP Drawing Set <br />Final Master Plan Report <br />Task 15.6 -Surveying, Elevations, and Profiles <br />Quantity <br />15 (each) -Hard Copy; Project Notebook (includes PAC) <br />1-Electronic Copy (Word) <br />15 (each) -Hard Copy; Project Notebook (includes PAC) <br />1-Electronic Copy {Word) <br />1-Hard Copy <br />5 -Hard Copy for Sponsor Review <br />15 -Electronic Copies (PDF on CD) <br />1-(FAA Internal airspace & other coordination) <br />3 -(Kittitas County/FM approval set) <br />1 -CADD Files and PDF <br />5-Hard Copy; 15 Electronic Copies (PDF on CD} <br />Topographic and obstruction data from AGIS (see Element 2) will be used for development of all plans. <br />Task 15. 7 -Scope Assumptions/Clarifications <br />1. The Consultant will coordinate and schedule all meetings between Kittitas County, FM, and the <br />Planning Advisory Committee (PAC) established for this planning effort. <br />2. Kittitas County staff, the FAA, WSDOT Aviation and the PAC will provide the Consultant with a <br />maximum of two rounds of comments for each project item. The Consultant shall receive <br />review comments from all groups within three (3) weeks of the submittal or presentation. The <br />consultant shall then address and resolve their comments prior to proceeding with the next <br />scope of work element. <br />Page ( 43 <br />I